<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Re: Erasing Changes Manager in Project data &amp; BIM</title>
    <link>https://community.graphisoft.com/t5/Project-data-BIM/Erasing-Changes-Manager/m-p/682373#M15117</link>
    <description>&lt;P&gt;24 is 5 years old already and I have not read about anybody else with this issue.&lt;/P&gt;
&lt;P&gt;My recommendation to track down why is to start with a new file and start copying to it until you see one of those changes appear to figure out what created it.&lt;/P&gt;
&lt;P&gt;For the existing file with all the changes I would do the forward merge trick:&lt;/P&gt;
&lt;UL&gt;
&lt;LI&gt;&lt;A href="https://community.graphisoft.com/t5/Installation-update/TIP-How-to-repair-a-corrupt-PLN-file/m-p/4502" target="_blank"&gt;https://community.graphisoft.com/t5/Installation-update/TIP-How-to-repair-a-corrupt-PLN-file/m-p/4502&lt;/A&gt;&lt;/LI&gt;
&lt;LI&gt;&lt;A href="https://community.graphisoft.com/t5/Installation-update/possible-alternative-to-forward-merge-for-corrupt-AC-files/m-p/14851#M1805" target="_blank"&gt;https://community.graphisoft.com/t5/Installation-update/possible-alternative-to-forward-merge-for-corrupt-AC-files/m-p/14851#M1805&lt;/A&gt;&lt;/LI&gt;
&lt;/UL&gt;</description>
    <pubDate>Mon, 03 Nov 2025 20:47:42 GMT</pubDate>
    <dc:creator>Eduardo Rolon</dc:creator>
    <dc:date>2025-11-03T20:47:42Z</dc:date>
    <item>
      <title>Erasing Changes Manager</title>
      <link>https://community.graphisoft.com/t5/Project-data-BIM/Erasing-Changes-Manager/m-p/682072#M15109</link>
      <description>&lt;P&gt;I have a gigantic list of changes that CAN´T be deletes because of some unknown reason.&amp;nbsp; &amp;nbsp;We have the habit of copying solutions from file to file, placing hotlinks from other PLN or TW files.. and we allways end up with a gigantic list of changes that sometimes have a LOCKED symbol on it.. I would like to know how to PURGE all the changes from any file so we can start a fresh list whenever is necessary.&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;&lt;FONT face="courier new,courier" color="grey"&gt;Operating system used: &lt;EM&gt;Windows 11&lt;/EM&gt;&lt;/FONT&gt;&lt;/P&gt;</description>
      <pubDate>Mon, 03 Nov 2025 02:40:37 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Project-data-BIM/Erasing-Changes-Manager/m-p/682072#M15109</guid>
      <dc:creator>BGrasselli</dc:creator>
      <dc:date>2025-11-03T02:40:37Z</dc:date>
    </item>
    <item>
      <title>Re: Erasing Changes Manager</title>
      <link>https://community.graphisoft.com/t5/Project-data-BIM/Erasing-Changes-Manager/m-p/682216#M15110</link>
      <description>&lt;BLOCKQUOTE&gt;&lt;HR /&gt;&lt;span class="lia-inline-image-display-wrapper lia-image-align-inline" image-alt="BGrasselli_1-1761943404971.jpeg" style="width: 999px;"&gt;&lt;img src="https://community.graphisoft.com/t5/image/serverpage/image-id/93924iD43CD2289A14AC99/image-size/large?v=v2&amp;amp;px=999" role="button" title="BGrasselli_1-1761943404971.jpeg" alt="BGrasselli_1-1761943404971.jpeg" /&gt;&lt;/span&gt;&lt;BR /&gt;&lt;BR /&gt;
&lt;P&gt;&lt;STRONG&gt;This is what is written on the manual:&lt;/STRONG&gt;&lt;/P&gt;
&lt;P class=""&gt;&lt;EM&gt;Changes from External Files&lt;/EM&gt;&lt;/P&gt;
&lt;P class=""&gt;&lt;EM&gt;When placing an external Drawing (via an Archicad view/Layout) or a Hotlinked Module in your model, the arriving files may include Change data.&lt;/EM&gt;&lt;/P&gt;
&lt;P class=""&gt;&lt;EM&gt;Changes in the Hotlinked file or external view are placed into the Host file and added to the host file’s Change Manager. However, note the following:&lt;/EM&gt;&lt;/P&gt;
&lt;P class=""&gt;&lt;EM&gt;•Such external Changes are shown with a lock icon and their details cannot be edited&lt;/EM&gt;&lt;/P&gt;
&lt;P class=""&gt;&lt;EM&gt;•Archived Changes in a Hotlinked file are not added to the host project&lt;/EM&gt;&lt;/P&gt;
&lt;P class=""&gt;&lt;EM&gt;•Changes in external Drawings are added to the host project only if they are visible on the Layout&lt;/EM&gt;&lt;/P&gt;
&lt;P class=""&gt;&lt;EM&gt;If the Change in the imported item has the same Change Number as a Change in the host file, they are combined as entries in the Change Manage&lt;/EM&gt;r.&lt;/P&gt;
&lt;P class=""&gt;&amp;nbsp;&lt;/P&gt;
&lt;P class=""&gt;&amp;nbsp;&lt;/P&gt;
&lt;P class=""&gt;NOW, how does someone have access to the file where the LIST OF CHANGES are kept??&lt;/P&gt;
&lt;/BLOCKQUOTE&gt;</description>
      <pubDate>Mon, 03 Nov 2025 02:38:55 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Project-data-BIM/Erasing-Changes-Manager/m-p/682216#M15110</guid>
      <dc:creator>BGrasselli</dc:creator>
      <dc:date>2025-11-03T02:38:55Z</dc:date>
    </item>
    <item>
      <title>Re: Erasing Changes Manager</title>
      <link>https://community.graphisoft.com/t5/Project-data-BIM/Erasing-Changes-Manager/m-p/682222#M15111</link>
      <description>&lt;P&gt;At the bottom of the last screenshot there should be a button for 'Transmittals" can you post a screenshot of it to see if it is empty or not.&lt;/P&gt;
&lt;P&gt;It should be empty or at most only one "Transmittal Set" and it should have the date as "Work in Progress".&lt;/P&gt;
&lt;P&gt;If it is not empty can you delete all the sets?&lt;/P&gt;
&lt;P&gt;Also, which version of AC are you using?&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;&lt;span class="lia-inline-image-display-wrapper lia-image-align-inline" image-alt="EduardoRolon_0-1761944797790.png" style="width: 400px;"&gt;&lt;img src="https://community.graphisoft.com/t5/image/serverpage/image-id/93926iD32D4C0A7A23906A/image-size/medium?v=v2&amp;amp;px=400" role="button" title="EduardoRolon_0-1761944797790.png" alt="EduardoRolon_0-1761944797790.png" /&gt;&lt;/span&gt;&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Fri, 31 Oct 2025 21:10:46 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Project-data-BIM/Erasing-Changes-Manager/m-p/682222#M15111</guid>
      <dc:creator>Eduardo Rolon</dc:creator>
      <dc:date>2025-10-31T21:10:46Z</dc:date>
    </item>
    <item>
      <title>Re: Erasing Changes Manager</title>
      <link>https://community.graphisoft.com/t5/Project-data-BIM/Erasing-Changes-Manager/m-p/682362#M15116</link>
      <description>&lt;P&gt;Hi Eduardo,&lt;/P&gt;&lt;P&gt;I do have this Transmittal set as Empty, but most of my changes are still locked. In other files, that i had an Issued Transmittal I tried opening the last set, deleting it and still the problem persists&lt;/P&gt;&lt;P&gt;I am using AC24&lt;/P&gt;</description>
      <pubDate>Mon, 03 Nov 2025 18:42:22 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Project-data-BIM/Erasing-Changes-Manager/m-p/682362#M15116</guid>
      <dc:creator>BGrasselli</dc:creator>
      <dc:date>2025-11-03T18:42:22Z</dc:date>
    </item>
    <item>
      <title>Re: Erasing Changes Manager</title>
      <link>https://community.graphisoft.com/t5/Project-data-BIM/Erasing-Changes-Manager/m-p/682373#M15117</link>
      <description>&lt;P&gt;24 is 5 years old already and I have not read about anybody else with this issue.&lt;/P&gt;
&lt;P&gt;My recommendation to track down why is to start with a new file and start copying to it until you see one of those changes appear to figure out what created it.&lt;/P&gt;
&lt;P&gt;For the existing file with all the changes I would do the forward merge trick:&lt;/P&gt;
&lt;UL&gt;
&lt;LI&gt;&lt;A href="https://community.graphisoft.com/t5/Installation-update/TIP-How-to-repair-a-corrupt-PLN-file/m-p/4502" target="_blank"&gt;https://community.graphisoft.com/t5/Installation-update/TIP-How-to-repair-a-corrupt-PLN-file/m-p/4502&lt;/A&gt;&lt;/LI&gt;
&lt;LI&gt;&lt;A href="https://community.graphisoft.com/t5/Installation-update/possible-alternative-to-forward-merge-for-corrupt-AC-files/m-p/14851#M1805" target="_blank"&gt;https://community.graphisoft.com/t5/Installation-update/possible-alternative-to-forward-merge-for-corrupt-AC-files/m-p/14851#M1805&lt;/A&gt;&lt;/LI&gt;
&lt;/UL&gt;</description>
      <pubDate>Mon, 03 Nov 2025 20:47:42 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Project-data-BIM/Erasing-Changes-Manager/m-p/682373#M15117</guid>
      <dc:creator>Eduardo Rolon</dc:creator>
      <dc:date>2025-11-03T20:47:42Z</dc:date>
    </item>
    <item>
      <title>Re: Erasing Changes Manager</title>
      <link>https://community.graphisoft.com/t5/Project-data-BIM/Erasing-Changes-Manager/m-p/682377#M15118</link>
      <description>&lt;P&gt;Mergin is not an option because we would lose all of the Viewsets.&lt;/P&gt;&lt;P&gt;I´ve find out what was bringing this changes into the files.. it´s fixed on the New projects.. my problem is to find a solution to the existing files the now require the changes to be tracked.&lt;/P&gt;</description>
      <pubDate>Mon, 03 Nov 2025 21:21:23 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Project-data-BIM/Erasing-Changes-Manager/m-p/682377#M15118</guid>
      <dc:creator>BGrasselli</dc:creator>
      <dc:date>2025-11-03T21:21:23Z</dc:date>
    </item>
    <item>
      <title>Re: Erasing Changes Manager</title>
      <link>https://community.graphisoft.com/t5/Project-data-BIM/Erasing-Changes-Manager/m-p/682379#M15119</link>
      <description>&lt;P&gt;The second link has the option to try that can/might keep the ViewSets&lt;/P&gt;</description>
      <pubDate>Mon, 03 Nov 2025 21:50:04 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Project-data-BIM/Erasing-Changes-Manager/m-p/682379#M15119</guid>
      <dc:creator>Eduardo Rolon</dc:creator>
      <dc:date>2025-11-03T21:50:04Z</dc:date>
    </item>
    <item>
      <title>Re: Erasing Changes Manager</title>
      <link>https://community.graphisoft.com/t5/Project-data-BIM/Erasing-Changes-Manager/m-p/682380#M15120</link>
      <description>&lt;P&gt;The locked changes are within the hotlinks themselves, and will need to be removed from there. the file name of the hotlink is after the relevant change.&lt;/P&gt;</description>
      <pubDate>Mon, 03 Nov 2025 22:51:55 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Project-data-BIM/Erasing-Changes-Manager/m-p/682380#M15120</guid>
      <dc:creator>MitchD</dc:creator>
      <dc:date>2025-11-03T22:51:55Z</dc:date>
    </item>
    <item>
      <title>Re: Erasing Changes Manager</title>
      <link>https://community.graphisoft.com/t5/Project-data-BIM/Erasing-Changes-Manager/m-p/682550#M15125</link>
      <description>&lt;P&gt;Yes, this problem is created by bringing in a hotlink and I´ve already located the "vilain" checking the Internal Library tab.. I´ve tried to remove all the hotlinks, the problem is once a hotlink is brought into the file (carrying changes) the changes can´t be erased.&amp;nbsp; Or at least i don´t know how.&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Tue, 04 Nov 2025 18:31:36 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Project-data-BIM/Erasing-Changes-Manager/m-p/682550#M15125</guid>
      <dc:creator>BGrasselli</dc:creator>
      <dc:date>2025-11-04T18:31:36Z</dc:date>
    </item>
    <item>
      <title>Re: Erasing Changes Manager</title>
      <link>https://community.graphisoft.com/t5/Project-data-BIM/Erasing-Changes-Manager/m-p/683305#M15138</link>
      <description>&lt;P&gt;Alright, I´ve worked out what was locking the changes to be deleted.&amp;nbsp; It has to do with the ICEberg workflow.&amp;nbsp; Quite complicated understand but here is what happend.&amp;nbsp; I have 3 files. A is general. B was Building 1. C was building 2. Files B and C were using a Hotlink from file A (Site Boundary.mod).&amp;nbsp; File A has modules from Files B and C placed on different levels.&amp;nbsp; So I couldn´t delete the changes because the Hotlinks were getting a loop within the files..&amp;nbsp; I order to solve it.. I had to delete the Hotlink from file A that was being used on files B and C and then delete all the changes, salve, update modules, delete again (because they were being used negative floors), and finally update all the Hotlink on the General, and only then I coudl delete everything!!&lt;/P&gt;</description>
      <pubDate>Mon, 10 Nov 2025 19:23:52 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Project-data-BIM/Erasing-Changes-Manager/m-p/683305#M15138</guid>
      <dc:creator>BGrasselli</dc:creator>
      <dc:date>2025-11-10T19:23:52Z</dc:date>
    </item>
  </channel>
</rss>

