<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Split schedule / adding information on each page seperately? in Project data &amp; BIM</title>
    <link>https://community.graphisoft.com/t5/Project-data-BIM/Split-schedule-adding-information-on-each-page-seperately/m-p/694558#M15421</link>
    <description>&lt;P&gt;Hello. I've ran into a possible problem when dealing with splitting a schedule to multiple layouts. If I want to add any additional information on only one of those split pages, it copies the same information on the other layout at the exact same location (e.g. adding text). Is there an option to toggle so that if I add text on one of the split layouts, it does not appear on the other at all?&lt;BR /&gt;Or is this a limitation when splitting a schedule on multiple layouts and my only option is to just have a duplicate layouts and hiding first or second part of the schedule on each page, to simulate a split schedule?&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&lt;FONT face="courier new,courier" color="grey"&gt;Operating system used: &lt;EM&gt;Windows &lt;/EM&gt;&lt;/FONT&gt;&lt;/P&gt;</description>
    <pubDate>Mon, 02 Mar 2026 09:02:53 GMT</pubDate>
    <dc:creator>Krispaco</dc:creator>
    <dc:date>2026-03-02T09:02:53Z</dc:date>
    <item>
      <title>Split schedule / adding information on each page seperately?</title>
      <link>https://community.graphisoft.com/t5/Project-data-BIM/Split-schedule-adding-information-on-each-page-seperately/m-p/694558#M15421</link>
      <description>&lt;P&gt;Hello. I've ran into a possible problem when dealing with splitting a schedule to multiple layouts. If I want to add any additional information on only one of those split pages, it copies the same information on the other layout at the exact same location (e.g. adding text). Is there an option to toggle so that if I add text on one of the split layouts, it does not appear on the other at all?&lt;BR /&gt;Or is this a limitation when splitting a schedule on multiple layouts and my only option is to just have a duplicate layouts and hiding first or second part of the schedule on each page, to simulate a split schedule?&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&lt;FONT face="courier new,courier" color="grey"&gt;Operating system used: &lt;EM&gt;Windows &lt;/EM&gt;&lt;/FONT&gt;&lt;/P&gt;</description>
      <pubDate>Mon, 02 Mar 2026 09:02:53 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Project-data-BIM/Split-schedule-adding-information-on-each-page-seperately/m-p/694558#M15421</guid>
      <dc:creator>Krispaco</dc:creator>
      <dc:date>2026-03-02T09:02:53Z</dc:date>
    </item>
    <item>
      <title>Re: Split schedule / adding information on each page seperately?</title>
      <link>https://community.graphisoft.com/t5/Project-data-BIM/Split-schedule-adding-information-on-each-page-seperately/m-p/694658#M15422</link>
      <description>&lt;P&gt;I have noticed some weird things that happen when splitting up drawings; so I just manually place the drawing on each layout or each instance. Its a couple extra steps to maintain and update, but you have to double check what the automation is producing anyway&lt;/P&gt;</description>
      <pubDate>Mon, 02 Mar 2026 17:43:58 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Project-data-BIM/Split-schedule-adding-information-on-each-page-seperately/m-p/694658#M15422</guid>
      <dc:creator>Patrick M</dc:creator>
      <dc:date>2026-03-02T17:43:58Z</dc:date>
    </item>
    <item>
      <title>Re: Split schedule / adding information on each page seperately?</title>
      <link>https://community.graphisoft.com/t5/Project-data-BIM/Split-schedule-adding-information-on-each-page-seperately/m-p/694713#M15423</link>
      <description>&lt;P&gt;I'm fine with manually placing the schedule on multiple layouts if I have to.&amp;nbsp;&amp;nbsp;&lt;BR /&gt;I would just like to understand if you cannot place elements / text only on a single layout of the split drawings.&lt;/P&gt;</description>
      <pubDate>Tue, 03 Mar 2026 10:48:57 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Project-data-BIM/Split-schedule-adding-information-on-each-page-seperately/m-p/694713#M15423</guid>
      <dc:creator>Krispaco</dc:creator>
      <dc:date>2026-03-03T10:48:57Z</dc:date>
    </item>
  </channel>
</rss>

