    <title>topic Re: Property Manager for Quantity Take-offs in Project data &amp; BIM</title>
    <link>https://community.graphisoft.com/t5/Project-data-BIM/Property-Manager-for-Quantity-Take-offs/m-p/704580#M15642</link>
    <description>&lt;P&gt;Late to this thread, but wanted to add a different angle.&lt;/P&gt;&lt;P&gt;The Property Manager approach described above is the right answer when you need custom expressions — derived areas by surface material, conditional counts, project-specific logic. That flexibility requires the setup time, and there's no shortcut around it.&lt;/P&gt;&lt;P&gt;Where I'd draw the distinction: if your IFC export already includes base quantities (IfcQuantityArea, IfcQuantityLength, IfcQuantityCount — standard in most Archicad exports), and your goal is a formatted client deliverable rather than a new schedule, the configuration step is essentially sunk cost you're repeating per project.&lt;/P&gt;&lt;P&gt;I built a tool for exactly that moment: ifcreport.app parses any IFC file in the browser — nothing uploaded to a server — and produces a formatted PDF quantity report in under 60 seconds, no configuration. Free tier covers 3 reports/month; Pro is €19/month and adds your client logo to the title block.&lt;/P&gt;&lt;P&gt;It won't compute custom expressions or quantities not already in the file. Complement to this workflow, not a replacement.&lt;/P&gt;&lt;P&gt;Disclosure: I built this tool.&lt;/P&gt;</description>
    <pubDate>Mon, 08 Jun 2026 06:32:24 GMT</pubDate>
    <dc:creator>ifcreport</dc:creator>
    <dc:date>2026-06-08T06:32:24Z</dc:date>
    <item>
      <title>Property Manager for Quantity Take-offs</title>
      <link>https://community.graphisoft.com/t5/Project-data-BIM/Property-Manager-for-Quantity-Take-offs/m-p/589361#M10131</link>
      <description>&lt;P&gt;I am looking to take out a lot more information from a model such as wall areas separated by surface materials, linear meter of objects such as balustrades, number of kitchen units, bathroom units etc.&lt;BR /&gt;&lt;BR /&gt;I was hoping to create all of this in a single schedule that would list elements based on a custom expression, instead of having individual schedules for each of these quantity take-offs. Is it possbile to create such an expression? Say if archicad classification =&amp;nbsp; wall, list its net outside surface area, if classification = railing, lits its 3d length, etc.&lt;/P&gt;</description>
      <pubDate>Thu, 22 Feb 2024 12:17:17 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Project-data-BIM/Property-Manager-for-Quantity-Take-offs/m-p/589361#M10131</guid>
      <dc:creator>Gabriel Cristea</dc:creator>
      <dc:date>2024-02-22T12:17:17Z</dc:date>
    </item>
    <item>
      <title>Re: Property Manager for Quantity Take-offs</title>
      <link>https://community.graphisoft.com/t5/Project-data-BIM/Property-Manager-for-Quantity-Take-offs/m-p/589771#M10139</link>
      <description>&lt;P&gt;You could possibly create a schedule that includes different elements, walls, railings, cabinets, etc.&lt;/P&gt;
&lt;P&gt;But you would need to add fields for all the information you want to collect for all of the elements.&lt;/P&gt;
&lt;P&gt;So you will have a column/row for railing length, another for wall area, another to count the number of cabinets.&lt;/P&gt;
&lt;P&gt;The length field may only show a figure for the railing and will be blank for all other elements.&lt;/P&gt;
&lt;P&gt;The number of cabinets will only show a value for cabinets and be blank for all other elements.&lt;/P&gt;
&lt;P&gt;Similar for the wall area - will only apply to walls.&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;So you will have a schedule with many blank fields and it may become difficult to read.&lt;/P&gt;
&lt;P&gt;Better to have separate schedules for specific element types I think.&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;Barry.&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Mon, 26 Feb 2024 07:10:29 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Project-data-BIM/Property-Manager-for-Quantity-Take-offs/m-p/589771#M10139</guid>
      <dc:creator>Barry Kelly</dc:creator>
      <dc:date>2024-02-26T07:10:29Z</dc:date>
    </item>
    <item>
      <title>Re: Property Manager for Quantity Take-offs</title>
      <link>https://community.graphisoft.com/t5/Project-data-BIM/Property-Manager-for-Quantity-Take-offs/m-p/704580#M15642</link>
      <description>&lt;P&gt;Late to this thread, but wanted to add a different angle.&lt;/P&gt;&lt;P&gt;The Property Manager approach described above is the right answer when you need custom expressions — derived areas by surface material, conditional counts, project-specific logic. That flexibility requires the setup time, and there's no shortcut around it.&lt;/P&gt;&lt;P&gt;Where I'd draw the distinction: if your IFC export already includes base quantities (IfcQuantityArea, IfcQuantityLength, IfcQuantityCount — standard in most Archicad exports), and your goal is a formatted client deliverable rather than a new schedule, the configuration step is essentially sunk cost you're repeating per project.&lt;/P&gt;&lt;P&gt;I built a tool for exactly that moment: ifcreport.app parses any IFC file in the browser — nothing uploaded to a server — and produces a formatted PDF quantity report in under 60 seconds, no configuration. Free tier covers 3 reports/month; Pro is €19/month and adds your client logo to the title block.&lt;/P&gt;&lt;P&gt;It won't compute custom expressions or quantities not already in the file. Complement to this workflow, not a replacement.&lt;/P&gt;&lt;P&gt;Disclosure: I built this tool.&lt;/P&gt;</description>
      <pubDate>Mon, 08 Jun 2026 06:32:24 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Project-data-BIM/Property-Manager-for-Quantity-Take-offs/m-p/704580#M15642</guid>
      <dc:creator>ifcreport</dc:creator>
      <dc:date>2026-06-08T06:32:24Z</dc:date>