<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Scheduler to Read Door ID from .Mod file? in Collaboration with other software</title>
    <link>https://community.graphisoft.com/t5/Collaboration-with-other/Scheduler-to-Read-Door-ID-from-Mod-file/m-p/52731#M4855</link>
    <description>&lt;DIV class="actalk-migrated-content"&gt;&lt;T&gt;Minor puzzle:&lt;BR /&gt;
&lt;BR /&gt;
I have a small building(garden shed) that is a MOD file linked to my main PLN file. I want the PLN to schedule the doors of the project, using &lt;BR /&gt;
&lt;BR /&gt;
Door Marker_NCS 10&lt;BR /&gt;
&lt;BR /&gt;
which picks up Zone # and Door ID as tag info. The Zone is in the main PLN, not the MOD, and to door tag on plan shows the desired information.&lt;BR /&gt;
&lt;BR /&gt;
Here's the problem:  In the schedule, it does not list all the tag info. It lists the door ID, but does not list the Zone number. &lt;BR /&gt;
&lt;BR /&gt;
This has scary implications for larger projects, where repeated elements(modules like baths, apartment types, etc) cannot be scheduled accurately.&lt;BR /&gt;
&lt;BR /&gt;
Why am I using a MOD for the garden shed? I can make 10 variations, that can easily be swapped in and out to show different ideas. &lt;BR /&gt;
&lt;BR /&gt;
-Nathan&lt;/T&gt;&lt;/DIV&gt;</description>
    <pubDate>Fri, 04 Aug 2006 19:08:41 GMT</pubDate>
    <dc:creator>Anonymous</dc:creator>
    <dc:date>2006-08-04T19:08:41Z</dc:date>
    <item>
      <title>Scheduler to Read Door ID from .Mod file?</title>
      <link>https://community.graphisoft.com/t5/Collaboration-with-other/Scheduler-to-Read-Door-ID-from-Mod-file/m-p/52731#M4855</link>
      <description>&lt;DIV class="actalk-migrated-content"&gt;&lt;T&gt;Minor puzzle:&lt;BR /&gt;
&lt;BR /&gt;
I have a small building(garden shed) that is a MOD file linked to my main PLN file. I want the PLN to schedule the doors of the project, using &lt;BR /&gt;
&lt;BR /&gt;
Door Marker_NCS 10&lt;BR /&gt;
&lt;BR /&gt;
which picks up Zone # and Door ID as tag info. The Zone is in the main PLN, not the MOD, and to door tag on plan shows the desired information.&lt;BR /&gt;
&lt;BR /&gt;
Here's the problem:  In the schedule, it does not list all the tag info. It lists the door ID, but does not list the Zone number. &lt;BR /&gt;
&lt;BR /&gt;
This has scary implications for larger projects, where repeated elements(modules like baths, apartment types, etc) cannot be scheduled accurately.&lt;BR /&gt;
&lt;BR /&gt;
Why am I using a MOD for the garden shed? I can make 10 variations, that can easily be swapped in and out to show different ideas. &lt;BR /&gt;
&lt;BR /&gt;
-Nathan&lt;/T&gt;&lt;/DIV&gt;</description>
      <pubDate>Fri, 04 Aug 2006 19:08:41 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Collaboration-with-other/Scheduler-to-Read-Door-ID-from-Mod-file/m-p/52731#M4855</guid>
      <dc:creator>Anonymous</dc:creator>
      <dc:date>2006-08-04T19:08:41Z</dc:date>
    </item>
  </channel>
</rss>

