    <description>&lt;DIV class="actalk-migrated-content"&gt;&lt;T&gt;This may have been talked about but for the last several days I have been into a large project door and window schedule problem and wondered about  others experiencing the same conditions: set up schedule - get all the parameters set and the schedule looks fine -- then find that I need to correct the leaf thickness of several of the entries. Set the element in the schedule window to highlight and attempt to fix the number from 1 3/4" to 1 3/8". Simple enough - except that the program wants to enter the number really fast to get it to accept --but when typing the number, as soon as the spacebar is hit some of the number disappears and I was left with 1' 3/8" for the entry . All various attempts to fix were met with greater difficulties at each step. Changed tactics to copy and paste from a correct cell and the number was accepted.&lt;BR /&gt;
&lt;BR /&gt;
Take weekend off- open file today and all of the changes did not hold and some of the entries reverted back to the 1' 3/8" entry----not fun. My stored alternate file ( saved to my laptop to take home) showed all the empty openings to be the door that the empty opening was originally selected from - not the empty opening. &lt;BR /&gt;
&lt;BR /&gt;
So the question is: is this buggy behavior?  bad files? limitations in the way the IS works? AND how to deal with the bog slow response time?&lt;BR /&gt;
&lt;BR /&gt;
This is from a door schedule of about 34 entries encompassing about 250 doors in unit plans for a 72 unit section of a project.&lt;BR /&gt;
&lt;BR /&gt;
Lew Bishop&lt;BR /&gt;
Jon Worden Architects&lt;BR /&gt;
G5 Dual 2.0 4GB nVidia 6800&lt;BR /&gt;
OS X 10.4.7 AC 10 966&lt;/T&gt;&lt;/DIV&gt;</description>
    <pubDate>Mon, 07 Aug 2006 18:59:01 GMT</pubDate>
    <dc:creator>Anonymous</dc:creator>
    <dc:date>2006-08-07T18:59:01Z</dc:date>
    <item>
      <title>IS Door Sched Param edits</title>
      <link>https://community.graphisoft.com/t5/Collaboration-with-other/IS-Door-Sched-Param-edits/m-p/54768#M5098</link>
      <description>&lt;DIV class="actalk-migrated-content"&gt;&lt;T&gt;This may have been talked about but for the last several days I have been into a large project door and window schedule problem and wondered about  others experiencing the same conditions: set up schedule - get all the parameters set and the schedule looks fine -- then find that I need to correct the leaf thickness of several of the entries. Set the element in the schedule window to highlight and attempt to fix the number from 1 3/4" to 1 3/8". Simple enough - except that the program wants to enter the number really fast to get it to accept --but when typing the number, as soon as the spacebar is hit some of the number disappears and I was left with 1' 3/8" for the entry . All various attempts to fix were met with greater difficulties at each step. Changed tactics to copy and paste from a correct cell and the number was accepted.&lt;BR /&gt;
&lt;BR /&gt;
Take weekend off- open file today and all of the changes did not hold and some of the entries reverted back to the 1' 3/8" entry----not fun. My stored alternate file ( saved to my laptop to take home) showed all the empty openings to be the door that the empty opening was originally selected from - not the empty opening. &lt;BR /&gt;
&lt;BR /&gt;
So the question is: is this buggy behavior?  bad files? limitations in the way the IS works? AND how to deal with the bog slow response time?&lt;BR /&gt;
&lt;BR /&gt;
This is from a door schedule of about 34 entries encompassing about 250 doors in unit plans for a 72 unit section of a project.&lt;BR /&gt;
&lt;BR /&gt;
Lew Bishop&lt;BR /&gt;
Jon Worden Architects&lt;BR /&gt;
G5 Dual 2.0 4GB nVidia 6800&lt;BR /&gt;
OS X 10.4.7 AC 10 966&lt;/T&gt;&lt;/DIV&gt;</description>
      <pubDate>Mon, 07 Aug 2006 18:59:01 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Collaboration-with-other/IS-Door-Sched-Param-edits/m-p/54768#M5098</guid>
      <dc:creator>Anonymous</dc:creator>
      <dc:date>2006-08-07T18:59:01Z</dc:date>
    </item>
  </channel>
</rss>
