<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Re: WINDOW SCHEDULE VS RENOVATION TOOL.... in Modeling</title>
    <link>https://community.graphisoft.com/t5/Modeling/WINDOW-SCHEDULE-VS-RENOVATION-TOOL/m-p/205986#M111518</link>
    <description>Have set the renovation tool over and over in every place I can fond it, set the project preferences, and every place I can find it in the program, you do realize how the tool wants to reset itself and it affects EVERY TOOL, LINE, etc one might use in a project AND because OF this is slowing my work down because sometimes when working fast I forget to tell the @$&amp;amp;king renovation tool to be existing.&lt;BR /&gt;
&lt;BR /&gt;
I do not understand adding a setting to every single tool that requires attention and slows the work, then calling it an Upgrade.??&lt;BR /&gt;
&lt;BR /&gt;
The window schedule I built kept changing and leaving off new windows even though I had set it, had to spend two houses troubleshooting to future out the problem,  upgrade/waste of time I control my output with layers/layer sets&lt;BR /&gt;
&lt;BR /&gt;
&lt;BR /&gt;
&lt;BR /&gt;
&lt;BR /&gt;
&lt;BR /&gt;
&lt;BR /&gt;

&lt;BLOCKQUOTE&gt;Sam wrote:&lt;BR /&gt;Did you change the door tool selection under Door Selection Setting  &amp;gt; Tags and Categories &amp;gt; Renovations . An option is there for Existing / to be demolished / New. I hope this works&lt;/BLOCKQUOTE&gt;</description>
    <pubDate>Wed, 24 Oct 2012 16:14:32 GMT</pubDate>
    <dc:creator>Anonymous</dc:creator>
    <dc:date>2012-10-24T16:14:32Z</dc:date>
    <item>
      <title>WINDOW SCHEDULE VS RENOVATION TOOL....</title>
      <link>https://community.graphisoft.com/t5/Modeling/WINDOW-SCHEDULE-VS-RENOVATION-TOOL/m-p/205984#M111516</link>
      <description>&lt;DIV class="actalk-migrated-content"&gt;&lt;T&gt;Creating a window schedule, but the renovation filter tool will not let me change some of my windows from "to be demolished" to "existing".&lt;BR /&gt;
&lt;BR /&gt;
I never wanted them to be demolished, they are new;  This tool "renovation" sucks.  If I can't give them the renovation status I want, what good is the tool?&lt;/T&gt;&lt;/DIV&gt;</description>
      <pubDate>Fri, 26 May 2023 12:25:09 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Modeling/WINDOW-SCHEDULE-VS-RENOVATION-TOOL/m-p/205984#M111516</guid>
      <dc:creator>Anonymous</dc:creator>
      <dc:date>2023-05-26T12:25:09Z</dc:date>
    </item>
    <item>
      <title>Re: WINDOW SCHEDULE VS RENOVATION TOOL....</title>
      <link>https://community.graphisoft.com/t5/Modeling/WINDOW-SCHEDULE-VS-RENOVATION-TOOL/m-p/205985#M111517</link>
      <description>Did you change the door tool selection under Door Selection Setting  &amp;gt; Tags and Categories &amp;gt; Renovations . An option is there for Existing / to be demolished / New. I hope this works</description>
      <pubDate>Wed, 24 Oct 2012 13:52:16 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Modeling/WINDOW-SCHEDULE-VS-RENOVATION-TOOL/m-p/205985#M111517</guid>
      <dc:creator>Sam Wheatley</dc:creator>
      <dc:date>2012-10-24T13:52:16Z</dc:date>
    </item>
    <item>
      <title>Re: WINDOW SCHEDULE VS RENOVATION TOOL....</title>
      <link>https://community.graphisoft.com/t5/Modeling/WINDOW-SCHEDULE-VS-RENOVATION-TOOL/m-p/205986#M111518</link>
      <description>Have set the renovation tool over and over in every place I can fond it, set the project preferences, and every place I can find it in the program, you do realize how the tool wants to reset itself and it affects EVERY TOOL, LINE, etc one might use in a project AND because OF this is slowing my work down because sometimes when working fast I forget to tell the @$&amp;amp;king renovation tool to be existing.&lt;BR /&gt;
&lt;BR /&gt;
I do not understand adding a setting to every single tool that requires attention and slows the work, then calling it an Upgrade.??&lt;BR /&gt;
&lt;BR /&gt;
The window schedule I built kept changing and leaving off new windows even though I had set it, had to spend two houses troubleshooting to future out the problem,  upgrade/waste of time I control my output with layers/layer sets&lt;BR /&gt;
&lt;BR /&gt;
&lt;BR /&gt;
&lt;BR /&gt;
&lt;BR /&gt;
&lt;BR /&gt;
&lt;BR /&gt;

&lt;BLOCKQUOTE&gt;Sam wrote:&lt;BR /&gt;Did you change the door tool selection under Door Selection Setting  &amp;gt; Tags and Categories &amp;gt; Renovations . An option is there for Existing / to be demolished / New. I hope this works&lt;/BLOCKQUOTE&gt;</description>
      <pubDate>Wed, 24 Oct 2012 16:14:32 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Modeling/WINDOW-SCHEDULE-VS-RENOVATION-TOOL/m-p/205986#M111518</guid>
      <dc:creator>Anonymous</dc:creator>
      <dc:date>2012-10-24T16:14:32Z</dc:date>
    </item>
  </channel>
</rss>

