<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Managing Design Options in Modeling</title>
    <link>https://community.graphisoft.com/t5/Modeling/Managing-Design-Options/m-p/258868#M135887</link>
    <description>&lt;DIV class="actalk-migrated-content"&gt;&lt;T&gt;Hello all,&lt;BR /&gt;
One thing that has always been difficult and a little clumsy is managing design options while working in Archicad. I am sure I am not the only one who has a frustrations with this, so i was wondering if anyone has a confident approach to this. I'll try and lay out some scenarios.&lt;BR /&gt;
&lt;BR /&gt;
1. Schematic Design phase- Whole building design options, massing studies, or maybe material choices.&lt;BR /&gt;
&lt;BR /&gt;
or&lt;BR /&gt;
&lt;BR /&gt;
2. When pretty deep in a Construction Documents phase, sometimes the client (or simply our inhouse design team) may ask for a redesign of a certain area. In this case we'd like to keep the Construction Documents intact as much as possible, while trying to explore different design options.&lt;BR /&gt;
&lt;BR /&gt;
Of course, one way to handle this would be to create new layers for each option (a-wall-option 3, or a-roof-option 2, or a-kitchen-option 2). This gets clumsy quickly when you're creating multiple layer options for multiple elements. Not to mention having to potentially creating new layer combinations.&lt;BR /&gt;
&lt;BR /&gt;
Another would be to somehow manipulate the Renovation Filter feature somehow, but i haven't wrapped my head around this.&lt;BR /&gt;
&lt;BR /&gt;
Another would be to copy and paste bits of the model and work completely separate from the model. i don't like this because i'd like to keep as much in the main model as possible.&lt;BR /&gt;
&lt;BR /&gt;
Another would be to somehow use hotlink modules and their master layers to cycle between options. Again, haven't figured this one out yet.&lt;BR /&gt;
&lt;BR /&gt;
I'm really just brainstorming and looking for some intelligent approaches that we can incorporate as a standard practice in our office. We use archicad 17 and 18, and we work on a wide variety of projects ranging from small retail and hospitality projects to large base building projects. Almost all in teamwork.&lt;BR /&gt;
&lt;BR /&gt;
Thanks in advance!&lt;BR /&gt;
-mb&lt;/T&gt;&lt;/DIV&gt;</description>
    <pubDate>Tue, 23 May 2023 12:27:05 GMT</pubDate>
    <dc:creator>Anonymous</dc:creator>
    <dc:date>2023-05-23T12:27:05Z</dc:date>
    <item>
      <title>Managing Design Options</title>
      <link>https://community.graphisoft.com/t5/Modeling/Managing-Design-Options/m-p/258868#M135887</link>
      <description>&lt;DIV class="actalk-migrated-content"&gt;&lt;T&gt;Hello all,&lt;BR /&gt;
One thing that has always been difficult and a little clumsy is managing design options while working in Archicad. I am sure I am not the only one who has a frustrations with this, so i was wondering if anyone has a confident approach to this. I'll try and lay out some scenarios.&lt;BR /&gt;
&lt;BR /&gt;
1. Schematic Design phase- Whole building design options, massing studies, or maybe material choices.&lt;BR /&gt;
&lt;BR /&gt;
or&lt;BR /&gt;
&lt;BR /&gt;
2. When pretty deep in a Construction Documents phase, sometimes the client (or simply our inhouse design team) may ask for a redesign of a certain area. In this case we'd like to keep the Construction Documents intact as much as possible, while trying to explore different design options.&lt;BR /&gt;
&lt;BR /&gt;
Of course, one way to handle this would be to create new layers for each option (a-wall-option 3, or a-roof-option 2, or a-kitchen-option 2). This gets clumsy quickly when you're creating multiple layer options for multiple elements. Not to mention having to potentially creating new layer combinations.&lt;BR /&gt;
&lt;BR /&gt;
Another would be to somehow manipulate the Renovation Filter feature somehow, but i haven't wrapped my head around this.&lt;BR /&gt;
&lt;BR /&gt;
Another would be to copy and paste bits of the model and work completely separate from the model. i don't like this because i'd like to keep as much in the main model as possible.&lt;BR /&gt;
&lt;BR /&gt;
Another would be to somehow use hotlink modules and their master layers to cycle between options. Again, haven't figured this one out yet.&lt;BR /&gt;
&lt;BR /&gt;
I'm really just brainstorming and looking for some intelligent approaches that we can incorporate as a standard practice in our office. We use archicad 17 and 18, and we work on a wide variety of projects ranging from small retail and hospitality projects to large base building projects. Almost all in teamwork.&lt;BR /&gt;
&lt;BR /&gt;
Thanks in advance!&lt;BR /&gt;
-mb&lt;/T&gt;&lt;/DIV&gt;</description>
      <pubDate>Tue, 23 May 2023 12:27:05 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Modeling/Managing-Design-Options/m-p/258868#M135887</guid>
      <dc:creator>Anonymous</dc:creator>
      <dc:date>2023-05-23T12:27:05Z</dc:date>
    </item>
  </channel>
</rss>

