    <title>topic Re: Hours per sheet as productivity measurement??? in Modeling</title>
    <link>https://community.graphisoft.com/t5/Modeling/Hours-per-sheet-as-productivity-measurement/m-p/65451#M33199</link>
    <description>D.A.&lt;BR /&gt;
&lt;BR /&gt;
15 to 20 yrs ago, this company (and rough first glance estimate only)&lt;BR /&gt;
calculated 40 hrs per sheet..agreed with your friend.&lt;BR /&gt;
&lt;BR /&gt;
i will get back to this post x more 'uptodate' info.&lt;BR /&gt;
&lt;BR /&gt;
let me correct the above:&lt;BR /&gt;
&lt;BR /&gt;
40 hrs per certain type of sheet&lt;BR /&gt;
30 hrs x others&lt;BR /&gt;
10 x other type and so on. &lt;BR /&gt;
&lt;BR /&gt;
(i dont go by hrs per sheet myself)</description>
    <pubDate>Mon, 04 Jun 2007 15:34:48 GMT</pubDate>
    <dc:creator>Rakela Raul</dc:creator>
    <dc:date>2007-06-04T15:34:48Z</dc:date>
    <item>
      <title>Hours per sheet as productivity measurement???</title>
      <link>https://community.graphisoft.com/t5/Modeling/Hours-per-sheet-as-productivity-measurement/m-p/65444#M33192</link>
      <description>&lt;DIV class="actalk-migrated-content"&gt;&lt;R&gt;I was talking with my still-drafting-on-a-board-unsightly-graphite-elbows architect neighbor. &lt;BR /&gt;
&lt;BR /&gt;
He said this:&lt;BR /&gt;
&lt;BR /&gt;
"When i worked in a big firm, we estimated that it would take forty hours per drawing sheet. With AutoCAD it grew to 60 and with [unnamed upstart BIM software] it is 120."&lt;BR /&gt;
&lt;BR /&gt;
&lt;B&gt;W&lt;/B&gt;orld &lt;B&gt;T&lt;/B&gt;rade &lt;B&gt;F&lt;/B&gt;ormat ????? I said to myself.&lt;BR /&gt;
&lt;BR /&gt;
I think that this is an absurd way to measure architectural productivity, but my neighbor, an otherwise intelligent and competent person, is convinced that the computer is a productivity hole and this is his take.&lt;BR /&gt;
&lt;BR /&gt;
In my own work, Archicad broadens my scope and brings delight to the visualizing and documentation process. That's partly because I don't make complex, evolving drawing sets. And it is in the revising that computers excell!  I think Archicad improves the quality of my work but on a productivity basis it is impossible for me to evaluate.&lt;BR /&gt;
&lt;BR /&gt;
Could you please take a few moments to comment on your experience?&lt;BR /&gt;
&lt;BR /&gt;
- does anyone care how much time it takes to produce a "sheet" of drawings? OR estmate job costs this way? Sort of silly to use '50's methods to evaluate modern production.&lt;BR /&gt;
&lt;BR /&gt;
- how much does the time hole of computer and software management detract from the promise of multiplied productivity? I spend way more time learning about software and way less time producing - but that is because i want to expand my knowledge and not just do a job...&lt;BR /&gt;
&lt;BR /&gt;
-what other problems tarnish the promise of turning architecture into a video game? Should Archicad have a shotgun object for flythrus?&lt;/R&gt;&lt;/DIV&gt;</description>
      <pubDate>Tue, 23 May 2023 15:08:31 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Modeling/Hours-per-sheet-as-productivity-measurement/m-p/65444#M33192</guid>
      <dc:creator>Dwight</dc:creator>
      <dc:date>2023-05-23T15:08:31Z</dc:date>
    </item>
    <item>
      <title>Re: Hours per sheet as productivity measurement???</title>
      <link>https://community.graphisoft.com/t5/Modeling/Hours-per-sheet-as-productivity-measurement/m-p/65445#M33193</link>
      <description>I just finished CD's for a 64,000 sq.ft. engineering faculty building. Including design development of the project, it came out to 115 drawing sheets (700+ drawings) and 1000 work hours for a total of ±8.75 hr/sheet.&lt;BR /&gt;
&lt;BR /&gt;
I did the time tracking just to establish my work baseline for a project and be able to double check my estimates against production. 120hrs per sheet is not very productive.</description>
      <pubDate>Sun, 03 Jun 2007 20:36:18 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Modeling/Hours-per-sheet-as-productivity-measurement/m-p/65445#M33193</guid>
      <dc:creator>Eduardo Rolon</dc:creator>
      <dc:date>2007-06-03T20:36:18Z</dc:date>
    </item>
    <item>
      <title>Re: Hours per sheet as productivity measurement???</title>
      <link>https://community.graphisoft.com/t5/Modeling/Hours-per-sheet-as-productivity-measurement/m-p/65446#M33194</link>
      <description>&lt;BLOCKQUOTE&gt;- how much does the time hole of computer and software management detract from the promise of multiplied productivity? I spend way more time learning about software and way less time producing - but that is because i want to expand my knowledge and not just do a job... &lt;/BLOCKQUOTE&gt;

About this my philosophy is that if something is taking too long there probably is an easier way to do it and I just don't know it yet. So I "invest" between 15 min to half an hour to see if I can find that procedure and in about 80% of the cases there is a way that I can achieve what I want in less time than I though and usually only using AC tools, no plugins or extra software needed.&lt;BR /&gt;
&lt;BR /&gt;
There is no better incentive than a looming deadline to make you productive which proves the 90%-10% rule, which states that:&lt;BR /&gt;
&lt;BR /&gt;
For any given project 10% of the work will take 90% of the time and 90% of the work will be done in the remaining 10% of the time.</description>
      <pubDate>Sun, 03 Jun 2007 20:46:45 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Modeling/Hours-per-sheet-as-productivity-measurement/m-p/65446#M33194</guid>
      <dc:creator>Eduardo Rolon</dc:creator>
      <dc:date>2007-06-03T20:46:45Z</dc:date>
    </item>
    <item>
      <title>Re: Hours per sheet as productivity measurement???</title>
      <link>https://community.graphisoft.com/t5/Modeling/Hours-per-sheet-as-productivity-measurement/m-p/65447#M33195</link>
      <description>Dwight,&lt;BR /&gt;
&lt;BR /&gt;
Clearly, your friend has not heard of the concept of TEMPLATES. It's hard to estimate a per/sheet timeframe, because some sheets may get generated fairly automatically and take only 10-20 minutes, if that.&lt;BR /&gt;
&lt;BR /&gt;
For me, the major time investment is really the time to model, and that is really not related to the number of sheets. However, in general, I can say that after I switched to the computer from graphite, I found myself making less and less on every project until I stopped billing hourly.</description>
      <pubDate>Sun, 03 Jun 2007 21:22:05 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Modeling/Hours-per-sheet-as-productivity-measurement/m-p/65447#M33195</guid>
      <dc:creator>Richard Morrison</dc:creator>
      <dc:date>2007-06-03T21:22:05Z</dc:date>
    </item>
    <item>
      <title>Re: Hours per sheet as productivity measurement???</title>
      <link>https://community.graphisoft.com/t5/Modeling/Hours-per-sheet-as-productivity-measurement/m-p/65448#M33196</link>
      <description>Let me get this clear.&lt;BR /&gt;
&lt;BR /&gt;
You made less and less on every project billing hourly, so you stopped billing entirely and offer money to clients so you can keep having computer fun? &lt;BR /&gt;
&lt;BR /&gt;
This is like being a farmer in Saskatchewan when wheat prices are low who wins the lottery and says that it won't change him. &lt;BR /&gt;
He'll just keep farming until all the money is spent.&lt;BR /&gt;
&lt;BR /&gt;
haha. Yes. Archicad's hourly productivity should go in your pocket, not in a reduced fee...</description>
      <pubDate>Sun, 03 Jun 2007 22:53:04 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Modeling/Hours-per-sheet-as-productivity-measurement/m-p/65448#M33196</guid>
      <dc:creator>Dwight</dc:creator>
      <dc:date>2007-06-03T22:53:04Z</dc:date>
    </item>
    <item>
      <title>Re: Hours per sheet as productivity measurement???</title>
      <link>https://community.graphisoft.com/t5/Modeling/Hours-per-sheet-as-productivity-measurement/m-p/65449#M33197</link>
      <description>OK. i don't charge according to "number of sheets", that's crazy&lt;BR /&gt;
- but i can estimate times &amp;amp; cost per sheet.&lt;BR /&gt;
&lt;BR /&gt;
this only relates to &lt;U&gt;&lt;/U&gt;&lt;S&gt;&lt;U&gt;&lt;U&gt;&lt;/U&gt;&lt;/U&gt;&lt;/S&gt;Drafting&lt;E&gt;&lt;/E&gt; work only (not design)&lt;BR /&gt;
&lt;BR /&gt;
when i do drafting contract work, i'll receive an accurate handdrawn design&lt;BR /&gt;
&lt;BR /&gt;
Lets say typ. large individually designed 2-3 storey residential project / single house&lt;BR /&gt;
400sqm - 600sqm size&lt;BR /&gt;
&lt;BR /&gt;
The architectural working drawings will comprise of (approx.)&lt;BR /&gt;
&lt;BR /&gt;
&lt;U&gt;&lt;/U&gt;&lt;S&gt;&lt;U&gt;&lt;U&gt;&lt;/U&gt;&lt;/U&gt;&lt;/S&gt;&lt;B&gt;7 x A1 sheets - &lt;/B&gt;&lt;E&gt;&lt;/E&gt; which is made up of...&lt;BR /&gt;
site plan&lt;BR /&gt;
floor plans (incl. roof plan)&lt;BR /&gt;
elevations&lt;BR /&gt;
3 to 7 sections(1:100) - depending on complexity&lt;BR /&gt;
3 to 5 construction details &lt;BR /&gt;
1:50 room layouts for wet areas (incl 1:50 stair layouts with elev/sect)&lt;BR /&gt;
electricals&lt;BR /&gt;
external door &amp;amp; window schedule&lt;BR /&gt;
&lt;BR /&gt;
This should take 60-70 hours drafting total &lt;BR /&gt;
(this obviously includes model creation)&lt;BR /&gt;
&lt;BR /&gt;
My final fee will usually equate to say min. $750 per A1 sheet (no less) - &lt;BR /&gt;
more the better!!&lt;BR /&gt;
&lt;BR /&gt;
This formula usually rings true for me, generally speaking...&lt;BR /&gt;
&lt;BR /&gt;
For design work plus working drawings...different ball game&lt;BR /&gt;
probably would be 2 - 3 times this approximation.&lt;BR /&gt;
&lt;BR /&gt;
Any thoughts on this as a comparison to others experience&lt;BR /&gt;
&lt;BR /&gt;
Peter</description>
      <pubDate>Mon, 04 Jun 2007 04:00:29 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Modeling/Hours-per-sheet-as-productivity-measurement/m-p/65449#M33197</guid>
      <dc:creator>Anonymous</dc:creator>
      <dc:date>2007-06-04T04:00:29Z</dc:date>
    </item>
    <item>
      <title>Re: Hours per sheet as productivity measurement???</title>
      <link>https://community.graphisoft.com/t5/Modeling/Hours-per-sheet-as-productivity-measurement/m-p/65450#M33198</link>
      <description>I think it's trying to measure the wrong thing. It's like measuring a manager by how many meetings he goes to.  It might be a number that you can get from the company's finance department, but you have to ask whether it is cause or effect or &lt;B&gt;&lt;I&gt;&lt;/I&gt;&lt;/B&gt;&lt;S&gt;&lt;B&gt;&lt;I&gt;&lt;I&gt;&lt;/I&gt;&lt;/I&gt;&lt;/B&gt;&lt;/S&gt;neither&lt;E&gt;&lt;/E&gt;.&lt;BR /&gt;
&lt;BR /&gt;
By-sheet estimates are not taking into account accuracy or quality. You might have drawn a detail, but is it right? Will it work in the field? Is it somehow against local practice standards? &lt;BR /&gt;
&lt;BR /&gt;
What about research? What if it takes two hours to look up a manufacturer (finding one you like and want to use), calling the sales rep, and getting the details that apply to your situation? &lt;BR /&gt;
&lt;BR /&gt;
What about the budget? If someone charges the client for 30 hours per sheet and it takes 35, who's problem is that? The poor estimator? Or the person doing the work?&lt;BR /&gt;
&lt;BR /&gt;
What about the client and the project manager? What if the client made lots of changes? Did the PM go after the extra service fees? Or just let them slide?&lt;BR /&gt;
&lt;BR /&gt;
Lastly, is it the person? Do you have a hotshot CAD operator who knows nothing about architecture and documentation and both requires a lot of guidance and makes a lot of mistakes? Or an average CAD user who's an experienced architect who does not need as much guidance and makes fewer mistakes because he understands the end result?&lt;BR /&gt;
&lt;BR /&gt;
Now, anyone who has had both manual drafting and computer should be able to compare the numbers of how long a project took before computers and after&lt;BR /&gt;
computers. At the same time, they need to look at all the above factors (and more). It's not just about looking at "30 hours per sheet" vs "25 hours per sheet." It's about what those numbers really represent.</description>
      <pubDate>Mon, 04 Jun 2007 12:51:56 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Modeling/Hours-per-sheet-as-productivity-measurement/m-p/65450#M33198</guid>
      <dc:creator>TomWaltz</dc:creator>
      <dc:date>2007-06-04T12:51:56Z</dc:date>
    </item>
    <item>
      <title>Re: Hours per sheet as productivity measurement???</title>
      <link>https://community.graphisoft.com/t5/Modeling/Hours-per-sheet-as-productivity-measurement/m-p/65451#M33199</link>
      <description>D.A.&lt;BR /&gt;
&lt;BR /&gt;
15 to 20 yrs ago, this company (and rough first glance estimate only)&lt;BR /&gt;
calculated 40 hrs per sheet..agreed with your friend.&lt;BR /&gt;
&lt;BR /&gt;
i will get back to this post x more 'uptodate' info.&lt;BR /&gt;
&lt;BR /&gt;
let me correct the above:&lt;BR /&gt;
&lt;BR /&gt;
40 hrs per certain type of sheet&lt;BR /&gt;
30 hrs x others&lt;BR /&gt;
10 x other type and so on. &lt;BR /&gt;
&lt;BR /&gt;
(i dont go by hrs per sheet myself)</description>
      <pubDate>Mon, 04 Jun 2007 15:34:48 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Modeling/Hours-per-sheet-as-productivity-measurement/m-p/65451#M33199</guid>
      <dc:creator>Rakela Raul</dc:creator>
      <dc:date>2007-06-04T15:34:48Z</dc:date>
    </item>
    <item>
      <title>Re: Hours per sheet as productivity measurement???</title>
      <link>https://community.graphisoft.com/t5/Modeling/Hours-per-sheet-as-productivity-measurement/m-p/65452#M33200</link>
      <description>&lt;BLOCKQUOTE&gt;TomWaltz wrote:&lt;BR /&gt;By-sheet estimates are not taking into account accuracy or quality. You might have drawn a detail, but is it right? Will it work in the field? Is it somehow against local practice standards? &lt;/BLOCKQUOTE&gt;

What? Does KA charge less for inaccurate and incomplete drawings? How do you calculate the delta? &lt;IMG src="https://community.graphisoft.com/legacyfs/online/emojis/icon_smile.gif" style="display : inline;" /&gt; &lt;IMG src="https://community.graphisoft.com/legacyfs/online/emojis/icon_smile.gif" style="display : inline;" /&gt; &lt;IMG src="https://community.graphisoft.com/legacyfs/online/emojis/icon_smile.gif" style="display : inline;" /&gt;&lt;BR /&gt;
&lt;BR /&gt;
I too have seen the 40 hours per sheet figure, but only as a rule of thumb to serve as a rough gauge of the complexity and scope of a project. Obviously there is a big difference between a 100,000 sf Butler building with a dozen sheets of standard details and a 10,000 sf custom residence where each trim piece is milled to the architect's specs - even though both buildings may take around the same number of sheets overall.&lt;BR /&gt;
&lt;BR /&gt;
Just like estimating building cost per square foot, per sheet cost has its place, but I certainly wouldn't base a fee structure on it.</description>
      <pubDate>Mon, 04 Jun 2007 22:17:18 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Modeling/Hours-per-sheet-as-productivity-measurement/m-p/65452#M33200</guid>
      <dc:creator>Anonymous</dc:creator>
      <dc:date>2007-06-04T22:17:18Z</dc:date>
    </item>
    <item>
      <title>Re: Hours per sheet as productivity measurement???</title>
      <link>https://community.graphisoft.com/t5/Modeling/Hours-per-sheet-as-productivity-measurement/m-p/65453#M33201</link>
      <description>&lt;BLOCKQUOTE&gt;Matthew wrote:&lt;BR /&gt;What? Does KA charge less for inaccurate and incomplete drawings? How do you calculate the delta? &lt;IMG src="https://community.graphisoft.com/legacyfs/online/emojis/icon_smile.gif" style="display : inline;" /&gt; &lt;IMG src="https://community.graphisoft.com/legacyfs/online/emojis/icon_smile.gif" style="display : inline;" /&gt; &lt;IMG src="https://community.graphisoft.com/legacyfs/online/emojis/icon_smile.gif" style="display : inline;" /&gt;&lt;/BLOCKQUOTE&gt;

That's kind of my point: It's a cost, not a charge. If we only charge for 30 hours per sheet and it takes 50 because if inaccuracy, that's a really bad thing!</description>
      <pubDate>Tue, 05 Jun 2007 00:52:05 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Modeling/Hours-per-sheet-as-productivity-measurement/m-p/65453#M33201</guid>
      <dc:creator>TomWaltz</dc:creator>
      <dc:date>2007-06-05T00:52:05Z</dc:date>
    </item>
    <item>
      <title>Re: Hours per sheet as productivity measurement???</title>
      <link>https://community.graphisoft.com/t5/Modeling/Hours-per-sheet-as-productivity-measurement/m-p/65454#M33202</link>
      <description>&lt;BLOCKQUOTE&gt;TomWaltz wrote:&lt;BR /&gt;&lt;BLOCKQUOTE&gt;Matthew wrote:&lt;BR /&gt;What? Does KA charge less for inaccurate and incomplete drawings? How do you calculate the delta? &lt;IMG src="https://community.graphisoft.com/legacyfs/online/emojis/icon_smile.gif" style="display : inline;" /&gt; &lt;IMG src="https://community.graphisoft.com/legacyfs/online/emojis/icon_smile.gif" style="display : inline;" /&gt; &lt;IMG src="https://community.graphisoft.com/legacyfs/online/emojis/icon_smile.gif" style="display : inline;" /&gt;&lt;/BLOCKQUOTE&gt;

That's kind of my point: It's a cost, not a charge. If we only charge for 30 hours per sheet and it takes 50 because if inaccuracy, that's a really bad thing!&lt;/BLOCKQUOTE&gt;

You do realize I intended that as a joke?&lt;BR /&gt;
&lt;BR /&gt;
My point is also that it is a way of &lt;I&gt;&lt;/I&gt;&lt;S&gt;&lt;I&gt;&lt;I&gt;&lt;/I&gt;&lt;/I&gt;&lt;/S&gt;roughly&lt;E&gt;&lt;/E&gt; estimating cost (to the firm) not price (to the client). Price is (or should be) determined by value. The higher the value you can provide (and sell to the client) for the lowest cost (to the firm) the greater the earnings.&lt;BR /&gt;
&lt;BR /&gt;
This is of course an area where architects are notoriously ineffective. Too many are happy just to earn a decent wage in return for accepting an ongoing liability - and thus may charge by hours per sheet.</description>
      <pubDate>Tue, 05 Jun 2007 02:16:59 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Modeling/Hours-per-sheet-as-productivity-measurement/m-p/65454#M33202</guid>
      <dc:creator>Anonymous</dc:creator>
      <dc:date>2007-06-05T02:16:59Z</dc:date>
    </item>
    <item>
      <title>Re: Hours per sheet as productivity measurement???</title>
      <link>https://community.graphisoft.com/t5/Modeling/Hours-per-sheet-as-productivity-measurement/m-p/65455#M33203</link>
      <description>To put it bluntly, your architect friend is an idiot. How many of you know of someone who went back to paper and pencil after using CAD?</description>
      <pubDate>Thu, 07 Jun 2007 18:11:50 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Modeling/Hours-per-sheet-as-productivity-measurement/m-p/65455#M33203</guid>
      <dc:creator>Anonymous</dc:creator>
      <dc:date>2007-06-07T18:11:50Z</dc:date>
    </item>
    <item>
      <title>Re: Hours per sheet as productivity measurement???</title>
      <link>https://community.graphisoft.com/t5/Modeling/Hours-per-sheet-as-productivity-measurement/m-p/65456#M33204</link>
      <description>&lt;BLOCKQUOTE&gt;Dyefrog wrote:&lt;BR /&gt;To put it bluntly, your architect friend is an idiot. How many of you know of someone who went back to paper and pencil after using CAD?&lt;/BLOCKQUOTE&gt;

I know a couple, but they also did not know which side of the mouse went down on the desk. (Why does my mouse keep blinding me??)</description>
      <pubDate>Thu, 07 Jun 2007 18:58:16 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Modeling/Hours-per-sheet-as-productivity-measurement/m-p/65456#M33204</guid>
      <dc:creator>TomWaltz</dc:creator>
      <dc:date>2007-06-07T18:58:16Z</dc:date>
    </item>
  </channel>
</rss>
