<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Calculation - IS - Walls and Columns in Documentation</title>
    <link>https://community.graphisoft.com/t5/Documentation/Calculation-IS-Walls-and-Columns/m-p/99458#M16032</link>
    <description>&lt;DIV class="actalk-migrated-content"&gt;Usually i have to deal with iregullar column shapes. I then use walls with different fill. &lt;BR /&gt;&lt;BR /&gt;Till here all normal.&lt;BR /&gt;&lt;BR /&gt;Lets make 2 walls perpendicular. One normal and one with concrete fill used as a column. I make both walls 1m long and 20cm thick and 3m height&lt;BR /&gt;&lt;BR /&gt;Now go to the IS (interactive schedule maker)&lt;BR /&gt;Make a wall list. The external surface on the reference (external) line = 1x3=3 square meters. BOTH. The 20cm overlap is not substracted by neither.&lt;BR /&gt;&lt;BR /&gt;I next change the layer of the column wall to a layer with a layer priority number ( i hope its called that way) 2. Now the column wall is on top of the normal wall but in the IS i still get 3 s.m for both.&lt;BR /&gt;&lt;BR /&gt;In the preferences i can set the priority for walls and columns and beams&lt;BR /&gt;but for 2 walls i cannot do that.&lt;BR /&gt;All computations are wrong. The volume of the 2 walls is wrong. The surface ...&lt;BR /&gt;&lt;BR /&gt;Does anyone know a solution to that problem? or am i somewhere wrong?&lt;/DIV&gt;</description>
    <pubDate>Mon, 10 Feb 2025 15:08:28 GMT</pubDate>
    <dc:creator>Anonymous</dc:creator>
    <dc:date>2025-02-10T15:08:28Z</dc:date>
    <item>
      <title>Calculation - IS - Walls and Columns</title>
      <link>https://community.graphisoft.com/t5/Documentation/Calculation-IS-Walls-and-Columns/m-p/99458#M16032</link>
      <description>&lt;DIV class="actalk-migrated-content"&gt;Usually i have to deal with iregullar column shapes. I then use walls with different fill. &lt;BR /&gt;&lt;BR /&gt;Till here all normal.&lt;BR /&gt;&lt;BR /&gt;Lets make 2 walls perpendicular. One normal and one with concrete fill used as a column. I make both walls 1m long and 20cm thick and 3m height&lt;BR /&gt;&lt;BR /&gt;Now go to the IS (interactive schedule maker)&lt;BR /&gt;Make a wall list. The external surface on the reference (external) line = 1x3=3 square meters. BOTH. The 20cm overlap is not substracted by neither.&lt;BR /&gt;&lt;BR /&gt;I next change the layer of the column wall to a layer with a layer priority number ( i hope its called that way) 2. Now the column wall is on top of the normal wall but in the IS i still get 3 s.m for both.&lt;BR /&gt;&lt;BR /&gt;In the preferences i can set the priority for walls and columns and beams&lt;BR /&gt;but for 2 walls i cannot do that.&lt;BR /&gt;All computations are wrong. The volume of the 2 walls is wrong. The surface ...&lt;BR /&gt;&lt;BR /&gt;Does anyone know a solution to that problem? or am i somewhere wrong?&lt;/DIV&gt;</description>
      <pubDate>Mon, 10 Feb 2025 15:08:28 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Documentation/Calculation-IS-Walls-and-Columns/m-p/99458#M16032</guid>
      <dc:creator>Anonymous</dc:creator>
      <dc:date>2025-02-10T15:08:28Z</dc:date>
    </item>
  </channel>
</rss>

