<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Re: Model based construction progress tracking in Documentation</title>
    <link>https://community.graphisoft.com/t5/Documentation/Model-based-construction-progress-tracking/m-p/238745#M36290</link>
    <description>Thanks for the hint - but how can I, standing in the construction site with my tablet/ phone, how can I edit these attributes?</description>
    <pubDate>Fri, 22 Jan 2021 16:40:22 GMT</pubDate>
    <dc:creator>Florian Lohberger</dc:creator>
    <dc:date>2021-01-22T16:40:22Z</dc:date>
    <item>
      <title>Model based construction progress tracking</title>
      <link>https://community.graphisoft.com/t5/Documentation/Model-based-construction-progress-tracking/m-p/238743#M36288</link>
      <description>&lt;DIV class="actalk-migrated-content"&gt;hi all,&lt;BR /&gt;&lt;BR /&gt;we are looking for a way to get a workflow to get the status of construction progress per element (e.g. wall; concrete done, insulation done, plaster done, paint done,...) into the model to visualise progress in the model.&lt;BR /&gt;Anyone can point us in the direction how that can be done with a Archicad model?&lt;BR /&gt;&lt;BR /&gt;Thanks!&lt;BR /&gt;&lt;BR /&gt;BR, Florian&lt;/DIV&gt;</description>
      <pubDate>Mon, 30 Dec 2024 12:43:55 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Documentation/Model-based-construction-progress-tracking/m-p/238743#M36288</guid>
      <dc:creator>Florian Lohberger</dc:creator>
      <dc:date>2024-12-30T12:43:55Z</dc:date>
    </item>
    <item>
      <title>Re: Model based construction progress tracking</title>
      <link>https://community.graphisoft.com/t5/Documentation/Model-based-construction-progress-tracking/m-p/238744#M36289</link>
      <description>i think the easiest way to do it is to combine the Construction Simulation feature in ARCHICAD with Property attribute&lt;BR /&gt;
&lt;BR /&gt;
you can create custom properties such as:&lt;BR /&gt;
start date&lt;BR /&gt;
duration&lt;BR /&gt;
end date&lt;BR /&gt;
construction status&lt;BR /&gt;
use formula to determine the status, something like: "if current date &amp;lt;= end date = "DONE"&lt;BR /&gt;
&lt;BR /&gt;
extract those properties on a schedule</description>
      <pubDate>Fri, 22 Jan 2021 15:57:34 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Documentation/Model-based-construction-progress-tracking/m-p/238744#M36289</guid>
      <dc:creator>Anonymous</dc:creator>
      <dc:date>2021-01-22T15:57:34Z</dc:date>
    </item>
    <item>
      <title>Re: Model based construction progress tracking</title>
      <link>https://community.graphisoft.com/t5/Documentation/Model-based-construction-progress-tracking/m-p/238745#M36290</link>
      <description>Thanks for the hint - but how can I, standing in the construction site with my tablet/ phone, how can I edit these attributes?</description>
      <pubDate>Fri, 22 Jan 2021 16:40:22 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Documentation/Model-based-construction-progress-tracking/m-p/238745#M36290</guid>
      <dc:creator>Florian Lohberger</dc:creator>
      <dc:date>2021-01-22T16:40:22Z</dc:date>
    </item>
    <item>
      <title>Re: Model based construction progress tracking</title>
      <link>https://community.graphisoft.com/t5/Documentation/Model-based-construction-progress-tracking/m-p/351788#M52565</link>
      <description>&lt;P&gt;Hi,&amp;nbsp;&lt;/P&gt;&lt;P&gt;I'm trying to find a solution for this too,&amp;nbsp;&lt;/P&gt;&lt;P&gt;So far, the best way is to use excel on a tablet and check items manually ,&amp;nbsp;&lt;/P&gt;&lt;P&gt;OR&lt;/P&gt;&lt;P&gt;use an IFC viewer that can edit ifc properties , select item in the model, change it's statut, and send back to Archicad,&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Did you find a better workflow ?&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Tue, 02 Aug 2022 10:00:27 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Documentation/Model-based-construction-progress-tracking/m-p/351788#M52565</guid>
      <dc:creator>Ahmed_K</dc:creator>
      <dc:date>2022-08-02T10:00:27Z</dc:date>
    </item>
  </channel>
</rss>

