<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Re: Change the Renovation Status in the detail views in Documentation</title>
    <link>https://community.graphisoft.com/t5/Documentation/Change-the-Renovation-Status-in-the-detail-views/m-p/644807#M65753</link>
    <description>&lt;P class="p1"&gt;&lt;STRONG&gt;Team:&lt;/STRONG&gt;&lt;/P&gt;
&lt;P class="p1"&gt;This was a mistake on my part. I had the warning window closed and did not read the warning that these changes would only take effect after rebuilding the detail.&lt;/P&gt;
&lt;P class="p2"&gt;&amp;nbsp;&lt;/P&gt;
&lt;P class="p1"&gt;Problem solved.&lt;/P&gt;</description>
    <pubDate>Sun, 29 Dec 2024 06:14:31 GMT</pubDate>
    <dc:creator>iggiv</dc:creator>
    <dc:date>2024-12-29T06:14:31Z</dc:date>
    <item>
      <title>Change the Renovation Status in the detail views</title>
      <link>https://community.graphisoft.com/t5/Documentation/Change-the-Renovation-Status-in-the-detail-views/m-p/644748#M65747</link>
      <description>&lt;P&gt;Hey team,&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;I’ve been working on a remodulation project and I’ve added some details with the RENOVATION STATUS. In one of these details, I created an element line LED profile light to show during inspections. I wanted to make it an element because I added PROFILE VALUES and lined the SPECIFICATION NUMBER. I later referred to the SPECIFICATION MANUAL for this.&lt;/P&gt;
&lt;P&gt;The issue is that when I add these elements to the details, they don’t show up on the schedule. So, I had to create a separate layer to make them visible on the schedule.&lt;/P&gt;
&lt;P&gt;Let me know if you have any questions or suggestions!&lt;/P&gt;
&lt;P&gt;Using RENOVATION STATUS there is no overwrite for planned, can not build an overwrite to leave things as is&lt;/P&gt;
&lt;P&gt;Hey team,&lt;/P&gt;
&lt;P&gt;&amp;nbsp;&lt;/P&gt;
&lt;P&gt;I’m working on a remodeling project using the RENOVATION STATUS. There are three overwrites: EXISTING, DEMOLITION, and NEW CONSTRUCTION. I’ve noticed that when planned, the overwrite is always NEW CONSTRUCTION. I’m planning to create four sets of drawings.&lt;/P&gt;
&lt;P&gt;EXISITING&lt;/P&gt;
&lt;P&gt;DEMOLISH&lt;/P&gt;
&lt;P&gt;NEW CONSTRUCTION&lt;/P&gt;
&lt;P&gt;PLANNED: This one is for the building that’s already being completed. I can achieve this by deleting the element in DEMOLISH and changing the NEW CONSTRUCTION to EXISTING.&lt;/P&gt;
&lt;P&gt;But I won’t have this set of drawings until I complete this sequence. It would be great if we could create an overwrite for the RENOVATION STATUS, but that’s not possible right now.&lt;/P&gt;</description>
      <pubDate>Sat, 04 Jan 2025 16:26:04 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Documentation/Change-the-Renovation-Status-in-the-detail-views/m-p/644748#M65747</guid>
      <dc:creator>iggiv</dc:creator>
      <dc:date>2025-01-04T16:26:04Z</dc:date>
    </item>
    <item>
      <title>Re: Change the Renovation Status in the detail views</title>
      <link>https://community.graphisoft.com/t5/Documentation/Change-the-Renovation-Status-in-the-detail-views/m-p/644807#M65753</link>
      <description>&lt;P class="p1"&gt;&lt;STRONG&gt;Team:&lt;/STRONG&gt;&lt;/P&gt;
&lt;P class="p1"&gt;This was a mistake on my part. I had the warning window closed and did not read the warning that these changes would only take effect after rebuilding the detail.&lt;/P&gt;
&lt;P class="p2"&gt;&amp;nbsp;&lt;/P&gt;
&lt;P class="p1"&gt;Problem solved.&lt;/P&gt;</description>
      <pubDate>Sun, 29 Dec 2024 06:14:31 GMT</pubDate>
      <guid>https://community.graphisoft.com/t5/Documentation/Change-the-Renovation-Status-in-the-detail-views/m-p/644807#M65753</guid>
      <dc:creator>iggiv</dc:creator>
      <dc:date>2024-12-29T06:14:31Z</dc:date>
    </item>
  </channel>
</rss>

