Not directly in the Interactive Schedules.
But you can add a parameter for the number of hooks and have the object script calculate and alter that parameter.
Then you schedule the parameter.
Similar for the length - if you want it rounded up to particular lengths then it has to be done in the scripts and set as parameter.
It can be done without saving as a parameter if you use the old List Scheme and the Property Script in the object, but if you are not using that already I would go with the setting a parameter and scheduling it.
Barry.
One of the forum moderators.
Versions 6.5 to 25
Dell XPS- i7-6700 @ 3.4Ghz, 16GB ram, GeForce GTX 960 (2GB), Windows 10
Dell Precision 3510 - i7 6820HQ @ 2.70GHz, 16GB RAM, AMD FirePro W5130M, Windows 10