BIM Coordinator Program (INT) April 22, 2024

Find the next step in your career as a Graphisoft Certified BIM Coordinator!

Collaboration with other software
About model and data exchange with 3rd party solutions: Revit, Solibri, dRofus, Bluebeam, structural analysis solutions, and IFC, BCF and DXF/DWG-based exchange, etc.

DOOR SCHEDULE

Anonymous
Not applicable
Attached is my door schedule...sort of.

Want to list doors alphabetically. Can anyone tell me how to get the schedule to list alphabetically, rather than the mess I have now. Never had this problem before.
3 REPLIES 3
Barry Kelly
Moderator
Go into the scheme settings for your schedule.
Then in the fields section turn on the sorting arrow next to the ID.
Can be set to ascending, descending or off depending on what you want.
The attached image is not a door schedule but you will get the idea.
Barry.
schedule_order.jpg
One of the forum moderators.
Versions 6.5 to 27
Dell XPS- i7-6700 @ 3.4Ghz, 16GB ram, GeForce GTX 960 (2GB), Windows 10
Lenovo Thinkpad - i7-1270P 2.20 GHz, 32GB RAM, Nvidia T550, Windows 11
Anonymous
Not applicable
Have attached my scheme settings, the suggestions did not work. I pushed every button, nothing changes except the Doors named Shower move...but the alphabetical listing does not work...any suggestions?
Scheme Settings.jpg
Anonymous
Not applicable
I figured it out. Somehow, when I was lettering the doors, a space was inadvertently added in front of the letters of the doors that kept showing up in front of the A main door. The schedule is correct now. Thanks for all your help!
Learn and get certified!