I created a finish schedule using a modified zone identifier. The Zone Area and Wall Surface Area categories put a decimal after the integer even though I have trailing zeros turned off in the Preferences (see graphic below). Is this a bug, or am I doing something wrong?
1 REPLY 1
Aussie John
Newcomer
Not sure if it is related, but in a door schedule, the decimal in size of the opening is controlled by the "working units" rather than the "dimension preferences". This is annoying.
Cheers John
John Hyland : ARINA : www.arina.biz
User ver 4 to 12 - Jumped to v22 - so many options and settings!!!
OSX 10.15.6 [Catalina] : Archicad 22 : 15" MacBook Pro 2019
[/size]