BIM Coordinator Program (INT) April 22, 2024
Find the next step in your career as a Graphisoft Certified BIM Coordinator!
Collaboration with other software
About model and data exchange with 3rd party solutions: Revit, Solibri, dRofus, Bluebeam, structural analysis solutions, and IFC, BCF and DXF/DWG-based exchange, etc.

Interactive schedule with zones questions

Achille Pavlidis
Enthusiast
Why the "Walls perimeter" in the Zone listing parameters doesn't subtract the doors width?

Why in the "Number of Objects" I get the doors counted to?
Mac OSX 13.6.6 | AC 27 INT 5003 FULL
1 REPLY 1
Gabor Almasi
Graphisoft
Graphisoft
We discussed this issue with Achille, so the Number of Objects counts only the marker of the door (if it is in the area of the zone), not the door itself.
"The Walls Perimeter" lists the perimeter of the walls bounding the zone no matter how many openings are placed into the walls.
In the wall list the Conditional Length parameter takes into count the length of the doors.
Gabor Almasi
Senior Product Manager
GRAPHISOFT
Learn and get certified!