It is not really a door schedule - it is a door frame schedule.
The frames are different - left and right handed.
The only way you can group them is not to include information tha makes them unique - such as the handing or the elevation/plan views.
Barry.
One of the forum moderators.
Versions 6.5 to 27
Dell XPS- i7-6700 @ 3.4Ghz, 16GB ram, GeForce GTX 960 (2GB), Windows 10
Lenovo Thinkpad - i7-1270P 2.20 GHz, 32GB RAM, Nvidia T550, Windows 11