Not possible with schedules.
They can only schedule elements placed in the model (plan).
Besides doing it with a schedule, you are only altering the placed instance of the element (object) and not the actual library part defaults.
And besides that, object parameters are not consistent across all objects in the default library.
Barry.
One of the forum moderators.
Versions 6.5 to 25
Dell XPS- i7-6700 @ 3.4Ghz, 16GB ram, GeForce GTX 960 (2GB), Windows 10
Dell Precision 3510 - i7 6820HQ @ 2.70GHz, 16GB RAM, AMD FirePro W5130M, Windows 10