BIM Coordinator Program (INT) April 22, 2024

Find the next step in your career as a Graphisoft Certified BIM Coordinator!

Collaboration with other software
About model and data exchange with 3rd party solutions: Revit, Solibri, dRofus, Bluebeam, structural analysis solutions, and IFC, BCF and DXF/DWG-based exchange, etc.

Scheduling speed

pejotu
Participant
Hi

I was wondering, as there certain parameters take noticeably longer to schedule (ifc attributes at least), is there a recommended order of filtering objects rapidly for scheduling?

So for example, is it important to specify conditions like layer or object type first, and then more detailed attributes, in the schedule settings? Or does the order have any effect on the performance?
2 REPLIES 2
alemanda
Advocate
I faced same speed issues when I set IFC rules in a low/medium size model ... I tried some combination but it seems that it's just IFC rules that slow down the scheduling process
AC 19 and AC21 latest hotfix
Win 10 Pro 64bit
Double XEON 14 CORES (tot 28 physical cores)
32GB RAM - SSD 256GB - Nvidia Quadro K620
Display DELL 25'' 2560x1440
www.almadw.it
Katalin Borszeki
Graphisoft
Graphisoft
Hi All,
The order of the criteria does indeed matter. It is recommended to do the bigger filterings first (element type, layer, etc.) so ARCHICAD could rule out most unrelevant elements first. This way AC doesn't have to look through all the project elements very detailed (eg. fire rating property value) but only have to check a smaller amount of elements. Usually this is why the schedule listing is a bit more slow when we are listing IFC properties. This is a quite detailed criteria which have to be looked through in every element. If we rule out all unnecessary elements which we know are irrelevant, then this would be faster as well. best, k
Katalin Borszeki
Implementation Specialist
GRAPHISOFT

http://helpcenter.graphisoft.com - the ArchiCAD knowledge base
Learn and get certified!