Collaborate forum
cancel
Showing results for 
Search instead for 
Did you mean: 

Forum Posts

Resolved! Pen Sets & Excel

Is there a way to get the pen set settings into excel? I am looking for a way to see the pen set number, colour and line weight in a table format. Or perhaps someone has a chart made up of the standard pen sets. KrisM

Anonymous by Not applicable
  • 303 Views
  • 2 replies
  • 0 likes

Filter light list by Story

Hi: I´m doing a two story project and creating a light list for it. I can't find a way to separate that list from one floor to the other. It just shows de entire amount of light fixtures from both floors. How can I effectively create a filter? and if...

Anonymous by Not applicable
  • 329 Views
  • 3 replies
  • 0 likes

Calculated fields

I have been asked to add a 'contingency' quantity to a schedule, which is a percentage of the quantity in the model. So, for example, if there are 26 in the model, I need to add 4 as contingency, making a total of 30 to be ordered from the supplier. ...

Bruce by Booster
  • 245 Views
  • 1 replies
  • 0 likes

Schedule individ skins w thickness?

Hi, I need a schedule with all my composite walls. Data needs to be ID, overall thickness, individual skin BM and thickness. I can't do that but suspect it's me...or? Suggestions appreciated. Mats

Spacing in restructured schedule

Is there a way to adjust the spacing between columns / rows in a restructured schedule? At the moment, it is set to 2mm, but I can't seem to find where to change this.

Bruce by Booster
  • 230 Views
  • 2 replies
  • 0 likes

Apply template settings to a project

Can you apply template settings to a project? The project has been started with the OOTB template, a few layouts have been setup and drawings issued but there are a number of elements and the continued design development that would benefit from the p...

Anonymous by Not applicable
  • 1836 Views
  • 3 replies
  • 0 likes