BIM Coordinator Program (INT) April 22, 2024
Find the next step in your career as a Graphisoft Certified BIM Coordinator!
Collaboration with other software
About model and data exchange with 3rd party solutions: Revit, Solibri, dRofus, Bluebeam, structural analysis solutions, and IFC, BCF and DXF/DWG-based exchange, etc.

door schedule filter

jarkwiat
Contributor
Hi! How can I filter my door schedule (without last floor)? AC10
Thanks...
ArchiCAD 27 POL FULL iMac 20,1 Intel Core i5 3,1 GHz 24GB RAM AMD Radeon Pro 5300 4 GB
2 REPLIES 2
Anonymous
Not applicable
EASY!

Open the schedule and click on the Scheme Settings button on the top right. Then in the Criteria panel ADD a new criteria. Select STORY and then say <> (which means does not equal) and type in the story number of the story you do not want to schedule.

Good luck!

Melisa
jarkwiat
Contributor
Thanks Melisa!! Indeed, it was easy...
Cheers!
Jarek
ArchiCAD 27 POL FULL iMac 20,1 Intel Core i5 3,1 GHz 24GB RAM AMD Radeon Pro 5300 4 GB
Learn and get certified!