BIM Coordinator Program (INT) April 22, 2024

Find the next step in your career as a Graphisoft Certified BIM Coordinator!

Modeling
About Archicad's design tools, element connections, modeling concepts, etc.

Change display value of renovation filter status in schedle

Anonymous
Not applicable
I have a schedule showing all doors in the project. One column shows the renovation status of the door. It shows as either 'New' or 'Existing' following the renovation status my colleagues or me has given each door. Everything is fine and works great!

BUT. I know this will blow your mind concidering my intimidating englishskill but I am not a native English speaker and the country I am in everybody does not speak English. Hence I want to be able to change in the schedule (automatically) so instead of 'New' i want it to say 'Ny' and instead of 'Existing' I want it to say 'Befintlig'. can this be done?
2 REPLIES 2
Barry Kelly
Moderator
I would say that the renovation status in hard coded into the Archicad program.
I don't have any non-english versions of Archicad so I can't say how they appear in other language versions.

Are you using a specific language version or the INT version which is English?

You can create and name your own renovation filters, but I don't know any way of changing the actual renovation status.

Barry.
One of the forum moderators.
Versions 6.5 to 27
Dell XPS- i7-6700 @ 3.4Ghz, 16GB ram, GeForce GTX 960 (2GB), Windows 10
Lenovo Thinkpad - i7-1270P 2.20 GHz, 32GB RAM, Nvidia T550, Windows 11
Anonymous
Not applicable
Ok, then I know. Thanks Barry!
Learn and get certified!