cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
Showing results for 
Search instead for 
Did you mean: 
Document & Visualize forum

How to assign renovation status to detail markers?

Paul King
Expert
I may be going blind, but cannot for the life of me see how to set the renovation status of a detail marker.
Grid markers, dims and text can have renovation status, so why can't detail markers? They are used in pursuit of the same documentation intent.

I would have thought it entirely foreseeable that detail references applying to a new building work status plan would not apply on a demolition status plan.

Yes, there is a workaround using layers, but this is an extra step and is an aberration in that it is otherwise completely unnecessary to define different layer combos for different phases of work.
PAUL KING
https://www.prime.net.nz
ArchiCAD 8-26
Octane Render Plugin for ArchiCAD
Twinmotion 2022
Windoze 11
Intel Core i9 10900K
Nvidia Gforce RTX 3080
32 Gb DDR3
2x4K 42" monitor extended desktop
2 REPLIES 2

Eduardo Rolon
Moderator
Known limitation. Same with any kind of marker.
eduardo rolón AIA NCARB
Another of the forum moderators.
Macbook Pro M1 Max 64GB ram
OS X 10.XX latest
AC25 US/INT -> AC08
Puerto Rico, BVI, Miami

Vectorworks 2023

zcgt21
Contributor

For the moment that possibility doesn't exist and is frustrating (sorry for the english)

Start a new conversation!

Still looking?

Browse more topics

Back to forum

See latest solutions

Accepted solutions

Start a new discussion!