Scheduling Component Data of Complex Profile Structures

Interactive Schedules allow you to list the individual components of Composite and Complex Profile structures. When creating a new Interactive Schedule scheme, you can select whether the scheme should list information on Construction Elements, Compon...

wp-content_uploads_2011_10_01_new-schedule-1.png wp-content_uploads_2011_10_02_components-1024x701.png wp-content_uploads_2016_11_05_schedules.png wp-content_uploads_2016_11_06_all.png
Anonymous by Not applicable
  • 458 Views
  • 0 comments
  • 0 likes

How to list the Wall Surface

In ARCHICAD listing/scheduling the Wall Surface is not possible if the Zone's body was modified with a Solid Element Operation. Until the correction is implemented there is a possible workaround. Basic idea Instead of the Zone we will list a Morph, c...

Element Previews in Schedules

From ARCHICAD 20 on the Interactive Schedule includes fields for graphic previews (2D and/or 3D) of any construction element ‐ not just Library Parts. The preview, a simplified thumbnail, is helpful in describing construction typologies within the pr...

wp-content_uploads_ac20_help_NewFeatures.03.13.1.png wp-content_uploads_ac20_help_03_2_Views_Virtual_Building.08.124.3.png
mtron by Graphisoft
  • 318 Views
  • 0 comments
  • 0 likes

Calculation/Schedule - Troubleshooting Guide

Known issues Incorrect results in the surface schedules if the composite of a wall is changed Affected version: 19,20 | Severity: workaround applicable | ID: 190411 Issue If the composite of a wall is changed in the Interactive Surface Schedule to an...

wp-content_uploads_2015_06_Surface-schedule-before-composite-change-1024x244.png wp-content_uploads_2015_06_Surface-schedule-after-composite-change-1024x244.png wp-content_uploads_2016_06_Info_18x18.png wp-content_uploads_archicadwiki_fireratinglistingparameter--011.jpg
Ed Brown by Graphisoft
  • 885 Views
  • 0 comments
  • 0 likes

Cost Calculation Using Interactive Schedules

In order to estimate the costs in a project please take the following steps. This example will calculate the individual and total costs of the four doors (two of which are identical) in the plan below. Step 1: Set Cost Values for Elements in the Proj...