Accurate Schedules and Quantity Takeoffs with Archicad

Gabriel Dantas
Graphisoft Alumni
Graphisoft Alumni

Archicad 25 introduces new properties for more accurate component Lists. You could schedule only the net value of component areas and component volumes in earlier versions: the holes were always subtracted. As of AC25, new "gross" and "conditional" area and volume properties are available to schedule component quantities.

wp-content_uploads_2021_05_Untitled-480p-210531.gif
New enhanced calculation rules dialog
wp-content_uploads_2021_05_image-5.png
  • With "gross" properties - holes in components are ignored.
  • With "conditional" properties - holes are subtracted or ignored depending on size - as required by many local standards. In the new Calculation Rules page of Project Preferences, you will set the most suitable conditions and configure them by the component's Building Material classification. This way, you can easily list components based on their Material-contingent function.
wp-content_uploads_2021_05_image-6.png
Example of a Detailed Component Area Schedule

With the new ‘gross’ and ‘conditional’ area and volume properties, it is possible to get more accurate building materials schedules and cost estimations. Furthermore, the user-defined and configurable conditions simplify the process to list components based on their Material-contingent function.

Learn about all the new documentation features of Archicad 25:

To learn more about all the new features of Archicad 25, read this article.

Comments
Martin Jules
Mentor

Great post, and thanks for sharing it with us!

What are the pros and cons of using Lists vs Interactive Schedules ?

 

I have never have found any use for Lists becasue I prefer Interactive Schedules.  But perhaps I am overlooking something.   ?     Why does Archicad have both?

Barry Kelly
Moderator

Lists are what we had before Interactive Schedules.

In some ways Lists are better as you can script GDL property objects to perform all sorts of calculations.

Now in Interactive Schedules we have Properties with Expressions (good but not quite as powerful in my opinion).

 

The problem with lists are they are old, not as easy to set up as schedules, and do not include any of the new tools, morphs, stairs, railings, opening tool - and I am not sure about the new segmented beams and columns.

 

If you have never used lists, I wouldn't bother about them.

 