If individual mesh nodes could have ID's, properties, and have the ability to be scheduled, this would allow for individual nodes to have their elevation adjusted via a schedule rather than the labor intensive method currently available. A possible alternative to this might be to have the ability to constrain a coordinate survey point to a node on a mesh or on a railing so that the elevation of the node could be controlled by the elevation of the coordinate survey point. Assuming that the survey control points elevation can be adjusted by a schedule, then this would allow for the nodes on a mesh or a railing to be controlled via a schedule.
Gary Ford
Self Employed - Modeling, Estimating, Construction
Archicad 12-26
AMD Ryzen 9 5900X 12-Core Processor
3701 Mhz, 12 Core(s), 24 Logical Processor(s)
(RAM) 128 GB
NVIDIA RTX A2000