2007-01-03 10:17 AM
2007-01-03 01:01 PM
2007-03-03 08:47 PM
Link wrote:Its not good!
In the meantime, use the third (skew) geometry method and let the first two dimension points determine the direction of the dimension.
Cheers,
Link.
2007-03-03 09:45 PM
"Link" wrote:
In the meantime, use the third (skew) geometry method and let the first two dimension points determine the direction of the dimension.
This technique will still work most of the time if you use a wall that starts the dimension in the orientation that you want and then dimension to the irregular points that you want. The extra step required will be deleting the nodes that you don't want but it ends the frustration a little anyway.
Cheers,
2007-03-04 04:02 AM
2007-03-04 10:16 AM
Link wrote:The problem is that archicad often kills new dimension line when points
And don't forget that you can always rotate dimensions after they have been placed.
Cheers,
Link.
2007-03-04 10:46 PM
2007-03-05 08:00 AM
Link wrote:When i trying to make long dimension line of the plan with many windows and so on, and accidentally forgot to switch construction method, archicad doesn't create dimension line at all! Then i usually say AAARRGGCHHICAD! That is the problem. Why not to ask user not to DELETE whole chain but change construction method at this moment.
Suresomepoints may disappear but it's still not a big deal IMHO.
Cheers,
Link.