I know there were some older posts on this topic, but they don't adress my specific suggestion.

The current story settings are not flexible for renovation projects. We always draw the current situation with the existing story settings, but often the new story setting are different.
In that case you either have to adapt your "existing" and "to be demolished" elements to your new settings. Which is a pain, especially as you are experimenting with different story settings. Or you have to offset the height of all new elements in reference to the story settings of the exisiting construction.

It could be a lot simpler with two story settings:

1. exisiting
2. new

Obviously the new story heights should not affect 'existing' and 'to be demolished' elements!

It would be even better if we could lock new elements or layers to prevent them from changing with the story settings. But my primary wish is to have stories implemented in the renovation status logic.
14 REPLIES 14

Anonymous
Not applicable
154 views and only 2 votes?
Is this a normal rate here? Or is there no interest at all in this wish?
Any suggestions to get more respons?

DGSketcher
Rockstar
Democracy at work 🙂

Sometimes our wishes are quite personally focussed. Whilst your own frustrations may be significant to you, the majority may not be dealing with the same issues or they may have a "workaround" to suit their circumstances. Consider your problem a challenge, draw upon the versatile strengths of AC and explore the options or even explain your problem in the open forum where you may get some pointers from those with relevant experience.
Apple iMac macOS Monterey / AC25UKI (most recent builds)

Anonymous
Not applicable
Hi DGSketcher,

I was under the impression that my frustrations were universal
I know how to deal with changing story settings (manually, which is not very BIM-minded..), and I know a lot of AC users that are frustrated about the lack of flexibility with the AC story settings. I don't see versatile strength here. There are like 3-6 workarounds for most AC challenges, but I know none for this problem..

Anyway, I was just wondering if this was forum related (busy users, so not much interaction), or due to my post - not clear enough or too personal a wish.
I used to be a regular visitor and poster at the PPB forum (pushpullbar - forum for architecture and sketchup matters) and maybe I'm used to more interaction and faster responses.

cheers, p

Dave Jochum
Booster
This is absolutely essential for architects involved with renovations. If you have a single story house to which you are adding a second story, there is no reasonable (BIM) way to properly show the existing UPPER PLATE story morphing to UPPER FLOOR story with an added UPPER PLATE story (one level higher than the original).
Dave Jochum

J o c h u m A R C H I T E C T S http://www.jochumarchitects.com

MBP 16" (M1 Max) 64 GB•OS 12.2•AC 25 (latest build)

Dave Jochum
Booster
pitrak, the workaround I use is very ugly un-BIM--a combination of patch fills and 2D text and line work. Sucks.
Dave Jochum

J o c h u m A R C H I T E C T S http://www.jochumarchitects.com

MBP 16" (M1 Max) 64 GB•OS 12.2•AC 25 (latest build)

Anonymous
Not applicable
Well, seems like we'll have to wait another year!
No story settings update in AC21.

Looking forward to seeing al the new tools in detail. And still hoping for more powerful and flexibel story settings in AC22. Or 23
Split-levels, redefining story settings without changes in the outer shell, renovation story settings, ... It could all be a lot easier than it is now.

Dave Jochum
Booster
pitrak wrote:
Well, seems like we'll have to wait another year!
No story settings update in AC21.


Split-levels, redefining story settings without changes in the outer shell, renovation story settings, ... It could all be a lot easier than it is now.
I completely agree.
Dave Jochum

J o c h u m A R C H I T E C T S http://www.jochumarchitects.com

MBP 16" (M1 Max) 64 GB•OS 12.2•AC 25 (latest build)

alemanda
Participant
What I'm saying is just brainstorming and I don't have archicad in front of me and I never tried what I'm going to suggest.
My idea is to draw the existing project and save it as pln, then open it as hotlink in a new pln where the story setting is different and add all the new element ... The elements saved as references to the story setting should adjust automatically to the levels of the host file, no?
Could it work?
AC 19 and AC21 latest hotfix
Win 10 Pro 64bit
Double XEON 14 CORES (tot 28 physical cores)
32GB RAM - SSD 256GB - Nvidia Quadro K620
Display DELL 25'' 2560x1440
www.almadw.it

Anonymous
Not applicable
Hi Alemanda,

I must have missed your reply here. I'm not very familiar with hotlinking, but I think you have to reference everything in the hotlink to one story in the pln. If not, it will translate to the story settings of the base pln. Right?

And you cannot change the renovation status of the elements in the hotlink. So you could add things, but not demolish certain parts.

So it's quite flawed as a workaround I'm afraid.

In the meanwhile, I'm working on another renovation in which a story height will probably change!

Barry Kelly
Moderator
What happens if you just adjust the 'height to next' of your storeys so the original ones above the inserted story(s) stay the same?

For example you have storey 1 with height to next of 3000 (sorry metric) and storey 2 - also with height to next of 3000 (but this is irrelevant for the top storey).

Now you want to insert a mezzanine level at 1500.
So do that and adjust the height to next for storey 1 to 1500 and set the height to next for mezzanine to 1500.
Storey 2 remains at its original height of 3000.

Remember you are setting the 'height to next' storey and not the usable height of the storey. Your elements are not restricted to this height.

Or do I misunderstand what you are trying to do?
I very rarely have anything to do with renovations or inserted stories.

Barry.

One of the forum moderators.
Versions 6.5 to 25
Dell XPS- i7-6700 @ 3.4Ghz, 16GB ram, GeForce GTX 960 (2GB), Windows 10
Dell Precision 3510 - i7 6820HQ @ 2.70GHz, 16GB RAM, AMD FirePro W5130M, Windows 10

Anonymous
Not applicable
Barry, that's interesting, I had no idea you could insert a story while maintaining the relations of the other stories.

That's not only relevant for adding a mezzanine. I've had a couple of projects where one or more floors were demolished and new floors were added at other levels. To make a 3 story house of an older structure with high ceiling, or to lower all the floors in order to create extra space under the roof. In such a case all the new floor levels are different from the existing ones.

But apparently you can just add stories in between and all the existing elements remain linked to their original story. So if you add a story between 1 and 2, 2 becomes 3 and walls on 1 are now top linked to story number 3!

The only disadvantage I see is that the exisiting and new plans will relate to different stories, meaning you some extra layout work to do, but that's not a big problem.

I will give it a try if I have another project like that, but from a first quick test, it seems to solve the problem. So thanks a lot for the suggestion!
stories renovation.JPG

Barry Kelly
Moderator
pitrak wrote:
I will give it a try if I have another project like that, but from a first quick test, it seems to solve the problem. So thanks a lot for the suggestion!
Excellent.
I am glad this seems to have helped.

Barry.

One of the forum moderators.
Versions 6.5 to 25
Dell XPS- i7-6700 @ 3.4Ghz, 16GB ram, GeForce GTX 960 (2GB), Windows 10
Dell Precision 3510 - i7 6820HQ @ 2.70GHz, 16GB RAM, AMD FirePro W5130M, Windows 10

henryL
Booster
There are a lot o workarounds but archicad still doesn't have a storeys grouping by building. Renovations or new buildings next to old ones are really annoying to model. Really hope on archicad 22.

This would be splendid idea also for conceptual design, where you can explore height levels between ideas. Or for example what is common in my country that investor after obtaining permit adds new story or change height levels.

So mu full support for this idea. 

 

Cheers,

Stefan

Versions 13 to 25
CPU: AMD Ryzen 9 5900X 12-Core