BIM Coordinator Program (INT) April 22, 2024

Find the next step in your career as a Graphisoft Certified BIM Coordinator!

Wishes
Post your wishes about Graphisoft products: Archicad, BIMx, BIMcloud, and DDScad.

Trace Reference and the Worksheet Tool

gdford
Advisor
It would be handy if the worksheet tool could capture the current trace reference.
Gary Ford
Self Employed - Modeling, Estimating, Construction
Archicad 12-26
AMD Ryzen 9 5900X 12-Core Processor
3701 Mhz, 12 Core(s), 24 Logical Processor(s)
(RAM) 128 GB
NVIDIA RTX A2000
1 REPLY 1
Laszlo Nagy
Community Admin
Community Admin
What do you mean by capture? Bring into the Worksheet Viewpoint as lines and fills and text?
If so, you can use the Switch Reference with Active button in the Trace Reference Palette, select the area you need with the Marquee, copy it to the Clipboard with CTRL+C, Switch Reference with Active again to go back to the Worksheet Viewpoint and paste those elements with CTRL+V.
Loving Archicad since 1995 - Find Archicad Tips at x.com/laszlonagy
AMD Ryzen9 5900X CPU, 64 GB RAM 3600 MHz, Nvidia GTX 1060 6GB, 500 GB NVMe SSD
2x28" (2560x1440), Windows 10 PRO ENG, Ac20-Ac27
Learn and get certified!