This post was prompted by other recent wishes for changes to the renovation filter which got me thinking about how I wish a CAD/BIM application would handle change. I reckon that implementation of an approach outlined below would be technically taxing and likely too much a leap for now - so perhaps it's more of a dream then a wish.
I think that the current approach is limited in such way that it won't get fixed by adding more Renovation Statuses and the ability to set Show On Renovation Filter to multiple filters. Besides being hard to overlook and manage the fact that the current solution is nothing more than a way to control element visibility and element display leaves it with two crucial limitations:
These limitations forces the creation of additional elements in order to handle change or alternative designs which is inefficient, increases the risk of errors/discrepancies, and at odds with the idea of BIM.
Outline to a new approach
The outlined approach hinges on the introduction of some new abilities:
A setup like below could be used to model a project involving an existing building and alternative designs.
Each element in the model gets a status based on what is done to it and in which configuration state. So for each element in the model there is a record for its status in each configuration state with entries like: Created in A; Existing in B; Modified in C1; Demolished in D.
Views are created based on these statuses in a way similar to Renovation Filters with the difference that it is set for configuration states. This nullifies the need to set visibility at element level in order to view different phases or alternatives.