Collaboration with other software
About model and data exchange with 3rd party solutions: Revit, Solibri, dRofus, Bluebeam, structural analysis solutions, and IFC, BCF and DXF/DWG-based exchange, etc.

DEFAULT SCHEDULE LAYER

Tom Krowka
Booster
Have generated a door schedule. Have floor plan open which shows doors. Attempt to edit door numbers, (or any other information). Shows that door layer is locked or hidden, when I can plainly see the doors (unlocked) on the window right behind the schedule.

If I look at layer combo, for some reason a combo other than the one displaying on the floor plan is selected. It appears that when I go to the schedule through the project map, or any other way, default combo goes to some arbitrary combo that I have not selected.

Any way to overcome this problem?
Tom Krowka Architect
Windows 11, AC Version 26
Thomas@wkarchwk.com
www.walshkrowka.com
1 REPLY 1
TomWaltz
Participant
The schedule in your View Map uses the Layer Combination that is active when it is made, just like any other defined View.

Either make sure you have a layer combination you like when you save the Schedule into your View Map or always use the Project Map to open your schedule so you can control the layers.
Tom Waltz