Collaboration with other software
About model and data exchange with 3rd party solutions: Revit, Solibri, dRofus, Bluebeam, structural analysis solutions, and IFC, BCF and DXF/DWG-based exchange, etc.

How to schedule SEO (Solid Element Operation)

Anonymous
Not applicable
Hi all,

Anyone used to schedule SEO before? I have a big model with a whole number of SEO all over the places and I'd like to check each of them if needed as SEO is causing problem when importing into Revit.

Hope to hear form you all soon.
Cheers
2 REPLIES 2
Laszlo Nagy
Community Admin
Community Admin
As far as I know quantities shown in Schedules take SEOs into consideration when displaying the volumes. However, I do not think there is a separate value that can show you how much volume was added to or subtracted from an element.

All I can think of is you could duplicate the SEO-ed elements, put them on another layer and undo all SEOs on them. This way you would have a version of each such element with and without SEO and you could compared their columes for checking purposes.
Loving Archicad since 1995 - Find Archicad Tips at x.com/laszlonagy
AMD Ryzen9 5900X CPU, 64 GB RAM 3600 MHz, Nvidia GTX 1060 6GB, 500 GB NVMe SSD
2x28" (2560x1440), Windows 10 PRO ENG, Ac20-Ac27
Anonymous
Not applicable
Many thanks Lasz
Still be a work-around.

Appreciated your response.