Collaboration with other software
About model and data exchange with 3rd party solutions: Revit, Solibri, dRofus, Bluebeam, structural analysis solutions, and IFC, BCF and DXF/DWG-based exchange, etc.

Interactive scheduling

Anonymous
Not applicable
Please can someone assist me?

I'm using interactive schedules for my door schedules. I've used standard ArchiCAD doors & the standard ArchiCAD scheduling tool. I used the "3D Front View" to generate an elevation of the doors. I used the "automatic dimensions" to generate the dimensions of leaf size. I then clicked on "Annotate" in the "3D Front View" and added vision panels, kickplates, etc using fills. I also added additional dimensions for the frame size, etc. If I now into my model & add another door of the same type it freaks out & I'm left with the default "3D Front View" without any of the fills or dimensions that I added. Can you tell me what I'm doing wrong?
0 REPLIES 0