BIM Coordinator Program (INT) April 22, 2024
Find the next step in your career as a Graphisoft Certified BIM Coordinator!
Collaboration with other software
About model and data exchange with 3rd party solutions: Revit, Solibri, dRofus, Bluebeam, structural analysis solutions, and IFC, BCF and DXF/DWG-based exchange, etc.

Scheduling the volume of wall "demolished" by a New Window

B_E_A_T_
Advocate
When I insert an "New" window into an "Existing" wall (using Renovation Tool), the whole created in the wall, is nicely displayed in a view of the demolished elements (e.g. in a red color).

Strangely enough the volume of the wall, that has to be "removed" to be able insert the room in real life, doesn't come up in the Schedule.

I Schedule walls, Renovation Status = To Be Demolished, the window is large enough, so any calculation rules for conditional volume don't apply...

is this a limitation of Renovation Tool?
(òÓ,)_\,,/

www.studiov2.be

Archicad 24/25/26
Rhino/Grasshopper
BIMcollab ZOOM

>>> Read my book!<<<
0 REPLIES 0
Learn and get certified!