BIM Coordinator Program (INT) April 22, 2024
Find the next step in your career as a Graphisoft Certified BIM Coordinator!
Collaboration with other software
About model and data exchange with 3rd party solutions: Revit, Solibri, dRofus, Bluebeam, structural analysis solutions, and IFC, BCF and DXF/DWG-based exchange, etc.

list and calcul

Anonymous
Not applicable
Hi,

I want to do a list of room of my project (that part is easy), with a column %

example :
Room1 10m² 66%
Room2 5m² 33%

Total 15m² 100%

Actually i do the math and make a column manualy. But that take a lot of time and i want to do it automaticaly.

Thanks for your help in advance,
2 REPLIES 2
Export the appropriate data form the Interactive Schedule to Excel and apply the formula there.

ArchiCAD 25 7000 USA - Windows 10 Pro 64x - Dell 7720 64 GB 2400MHz ECC - Xeon E3 1535M v6 4.20GHz - (2) 1TB M.2 PCIe Class 50 SSD's - 17.3" UHD IPS (3840x2160) - Nvidia Quadro P5000 16GB GDDR5 - Maxwell Studio/Render 5.2.1.49- Multilight 2 - Adobe Acrobat Pro - ArchiCAD 6 -25

Anonymous
Not applicable
That's what i do, but each time i update area, i need to redo the whole thing (export to excel, copy number to archicad in presentation..)
Learn and get certified!