cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
Showing results for 
Search instead for 
Did you mean: 

The 2025 Technology Preview Program is now live. Join today!

Documentation
About Archicad's documenting tools, views, model filtering, layouts, publishing, etc.

Manually change order in ‘Project Info’

Rve
Booster

Please Archicad, make it possible to manually change the order of all added fields in the Project Info. And please make it possible to layout the fields (text font, height, color, bold/italic, etc.)

 

Our firm uses the project info to add Autotext that appear on multiple drawings. When the text needs to be changed on all drawings we only have to adjust the text in the Project Info. Downside is that you have to search for the right text because the fields can not be ordered. 

1 REPLY 1
Minh Nguyen
Graphisoft Alumni
Graphisoft Alumni

Hello,

Thank you very much for sharing this great idea!

I'm glad to say that this is an existing wish in our Wish list database
(for future reference, you can refer to it as IDEA-1152). Hopefully, our Product Management team will adopt this one in the future.

Have a great day!
Best regards,
Minh

Minh Nguyen
Technical Support Engineer
GRAPHISOFT