2017-11-1502:28 PM - last edited on 2023-05-2602:24 AM by Gordana Radonic
2017-11-1502:28 PM
Hi,
We've managed to delete 20 layouts in our team work project. Wo have a backup copy with the layouts and now when I add the layouts from the backup to the tw project throught organizer all drawging link to the backup file. Both the backup file and the TW file have the same structure in the view map and I thought it must be possible to just point all drawing in one swoop but obviously not or at least I haven't found any other way than manually re-linking every drawing. Any ideas?
/Mats
I think you can change the source in Drawing manager. Select all wanted drawings, and right click. Select from where to update. I think (and hope) you can link only to that upper level, a project file. I did not try. With external files it works at least.
Maybe that's what you are looking for?
AC27, Rhino7/8+Grasshopper, TwinMotion • Mac Pro 6,1 E5-1650v2-3,5GHz/128GB/eGPU:6800XT/11.6.5 • HP Z4/Xeon W-2195/256GB/RTX4080FE 16GB/W11ProWS