2013-04-17 12:49 AM
2013-04-17 02:04 AM
2018-07-23 04:18 PM
Matthew wrote:Yes, we need to have differents plans for each phase of the construction, and each profession.
What we really need is a full overhaul which would allow phasing, alternates and even construction sequencing.
2019-04-21 02:16 AM
2021-01-19 02:41 PM
2021-02-05 04:16 AM
peter_h wrote:Yes we need this option but not as a hack to cover other holes in the software. As someone else stated, we need phasing/staging and design options as first class citizens, not some second rate hacks.
Aswell as the in-built EXISTING/DEMO/NEW states, it would be great if we could add new states. These states could then be used as an elegant solution to the problem of how best to manage multiple building design options.
So imagine if we could have DEMO1, DEMO2, NEW1 & NEW2 states aswell (and also control their display with filters), then it would be very simple to show multiple options for a renovation -- without having to resort to multiple plns and hotlinks.
2021-02-05 11:05 AM
2021-03-10 03:13 PM
2021-04-29 10:22 PM
| Archicad 4.55 - 26
| HP Z840 | 2× E5-2643 v4 | 64 GB RAM | Quadro M5000 | Windows 10 Pro x64
| HP Z4 G4 | W-2245 | 64 GB RAM | RTX A4000 | Windows 11