SCHEDULES - INDEPENDENT
Anonymous
Not applicable
Options
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
2019-05-16 08:32 PM
2019-05-16
08:32 PM
Any Ideas?
The Interactive Schedules are generated from actual objects.
Labels:
- Labels:
-
Data management
2 REPLIES 2

Options
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
2019-05-17 03:16 AM
2019-05-17
03:16 AM
They aren't really designed to do that.
There are 10 'Custom' fields that you can add to any schedule that will allow you to type what ever you want in them.
If you add these on their own you can not control the number of cells for that field as you are not scheduling anything from the actual model which would control the number of cells based on the number of elements being scheduled.
I don't think you can add a cell that will allow images.
Barry.
There are 10 'Custom' fields that you can add to any schedule that will allow you to type what ever you want in them.
If you add these on their own you can not control the number of cells for that field as you are not scheduling anything from the actual model which would control the number of cells based on the number of elements being scheduled.
I don't think you can add a cell that will allow images.
Barry.
One of the forum moderators.
Versions 6.5 to 27
i7-10700 @ 2.9Ghz, 32GB ram, GeForce RTX 2060 (6GB), Windows 10
Lenovo Thinkpad - i7-1270P 2.20 GHz, 32GB RAM, Nvidia T550, Windows 11
Versions 6.5 to 27
i7-10700 @ 2.9Ghz, 32GB ram, GeForce RTX 2060 (6GB), Windows 10
Lenovo Thinkpad - i7-1270P 2.20 GHz, 32GB RAM, Nvidia T550, Windows 11
Anonymous
Not applicable
Options
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
2019-05-23 10:40 PM
2019-05-23
10:40 PM
Thank you Barry. Sometimes knowing what you can't do is as helpful as knowing what you can.
Probably the best thing would be to make a standard set of connections in a grid and just keep in with av detail creation folder. Then they are there and can be modified as the job requires.
That would be a wish list item is suppose.
Probably the best thing would be to make a standard set of connections in a grid and just keep in with av detail creation folder. Then they are there and can be modified as the job requires.
That would be a wish list item is suppose.