We value your input!
Please participate in Archicad 28 Home Screen and Tooltips/Quick Tutorials survey

Collaboration with other software
About model and data exchange with 3rd party solutions: Revit, Solibri, dRofus, Bluebeam, structural analysis solutions, and IFC, BCF and DXF/DWG-based exchange, etc.

Schedules for Handrail Guardrails

Anonymous
Not applicable
I'm working on a project with A LOT of handrails and guardrails. Currently the project is in a preliminary and costing phase so using the schedule function could be incredibly helpful.

It seems that the schedule is picking up the length of the handrail not including the overhang - and the minimum overhang is 3/4". So, the length shown on the schedule is always at least 1 1/2" off. Does anyone know how to get the schedule to pick up the actual outside length of the handrail or guardrail?

The schedule is also showing the (inaccurate) length to a 1/16" accuracy, and at this point it would be better to be at a one inch accuracy. I changed all of the options in preferences to one inch, but the schedules are still showing 1/16". Does anyone know how to change the level of accuracy in the schedules?

schedule copy.jpg
11 REPLIES 11
Nuge
Advocate
Steve,

Is it still possible to get hold of these objects, I have a large project with a heap of these kind for handrails.

PM me for my details

Kind Regards Nuge
AC27 i9 11900K / 128G ram / GTX 3090 / D5 Render
this one ?
http://archicad-talk.graphisoft.com/viewtopic.php?p=216476&highlight=pipe+railing#216476

ArchiCAD 25 7000 USA - Windows 10 Pro 64x - Dell 7720 64 GB 2400MHz ECC - Xeon E3 1535M v6 4.20GHz - (2) 1TB M.2 PCIe Class 50 SSD's - 17.3" UHD IPS (3840x2160) - Nvidia Quadro P5000 16GB GDDR5 - Maxwell Studio/Render 5.2.1.49- Multilight 2 - Adobe Acrobat Pro - ArchiCAD 6 -25