Hello.
I created some slabs to use them as ceiling on a project.
I placed them all on the same height. I tried to make a schedule to see (and change) their height, the zone name & number (where they belong) so that I could change their height according to the room type.
The problem is that in the schedule I get an "---" text instead of the zone name and number.
What do I do wrong?
Thanks FK