cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
Showing results for 
Search instead for 
Did you mean: 
2024 Technology Preview Program

2024 Technology Preview Program:
Master powerful new features and shape the latest BIM-enabled innovations

Collaboration with other software
About model and data exchange with 3rd party solutions: Revit, Solibri, dRofus, Bluebeam, structural analysis solutions, and IFC, BCF and DXF/DWG-based exchange, etc.

Suffix m2

Anonymous
Not applicable
Hi!
The suffix "m2" in Archicad Schedule is a big problem for me. I'm trying to create a master Excel spreadsheet composed by several Archicad schedules and the field "grand total" with the suffix "m2" is not a valid number in excel. Is there a way to make a "grand total" areas without the suffix "m2"?
Thanks!
2 REPLIES 2
Anonymous
Not applicable
Solved: I exported the Archicad schedules as txt and I linked in excel master spreadsheet moving automatically the suffix "m2" to another column, that way I can use the grand total only as number.
Alex Moruzzi
Participant
Well, as the totals are not real areas, the good thing is that in Excel, they don't add themselves to others when included in sums... I think it's the best way to have them export... hope they don't change it.
Archicad 19 - OSX10.10 - MBP early 2011 16G/ssd