2017-08-21 12:36 PM
2017-08-22 02:40 AM
2017-08-22 10:39 AM
Barry wrote:In which object do I have put the old GUID into the Migration list?
That is basically it.
However make sure you have the old GUID in the 'Migration' list - that is a different button to the 'Forward Migration' script. Do not have the new GUID in that list.
2017-08-22 10:54 AM
2017-08-22 11:22 AM
Barry wrote:Thanks very much, got it working correctly. The only way I got it working was by getting the GUID directly from the Migration tab. The GUID pulled from the sub-type page didn't work at all and actually didn't have anything the same as the GUID from the Migration tab, very strange. Thanks again.
It get hard to answer when the post is in 2 places at once.
http://gdl.graphisoft.com/forums/topic/forward-migration
I think we have discovered there that your GUID is too long - you will know exactly what it is when you set the ID in the migration list.
The old GUID goes in the new object that has the migration script.
Barry.
2017-08-22 12:22 PM
Barry wrote:A little more help is needed. How do I open a 19 project in 21 and have all of the objects switch over?
It get hard to answer when the post is in 2 places at once.
http://gdl.graphisoft.com/forums/topic/forward-migration
I think we have discovered there that your GUID is too long - you will know exactly what it is when you set the ID in the migration list.
The old GUID goes in the new object that has the migration script.
Barry.
2017-08-23 02:24 AM
JGoode wrote:They should swap over when you delete the 19 library and load the 21 library.
A little more help is needed. How do I open a 19 project in 21 and have all of the objects switch over?
2017-08-23 10:56 AM
Barry wrote:Thanks for all the help, Barry. This was a bit of a silly question and I wasn't thinking properlyJGoode wrote:They should swap over when you delete the 19 library and load the 21 library.
A little more help is needed. How do I open a 19 project in 21 and have all of the objects switch over?
Make sure the old object is not in the 21 library or the embedded library or else it will simply stay as it is.
The new object of course needs to be in the 21 library.
Barry.