I have used it fine with 10, but very limited. I generally still use the old list function and export to Excel as I need to build a material take off, and that is still the only way to get that done (ac11 maybe?). But in playing around the Scheduler it seems fine, but I haven't been modifying any parameters with it.. just pulling it up.