cancel
Showing results for 
Search instead for 
Did you mean: 
EN
cancel
Showing results for 
Search instead for 
Did you mean: 
Anonymous
Not applicable

can i make schedule start from Ground floor ?

Hi every one i copied doors and windows from other projects of mine so i am intending to copy them always in every project if i made them in floor say -2 under ground floor can i exclude it from calculated inside schedule please tell me how and thanks
1 Reply 1
vistasp
Advisor
Hi Ahmed,

It might look a little different in v14/15 but essentially, you have to add a criterion that eliminates all doors/windows on the storey -2.
storey option in schedules.jpg
= v i s t a s p =
bT Square Peg
https://archicadstuff.blogspot.com
https://www.btsquarepeg.com
| AC INT | Win11 | Ryzen 5700 | 64 GB | RTX 3050 |

Didn't find the answer?

Check other topics in this Forum

Back to Forum

Read the latest accepted solutions!

Accepted Solutions

Start a new conversation!