A worksheet can get information from your model (plan) but any changes made in the worksheet will not transfer back to the model.
If you can place what you want to edit as a trace reference (you plan viewpoint), then you can switch so the trace reference becomes the current window (i.e. it will become editable and the worksheet will become the trace reference), you can make your changes to it and then switch back so the worksheet is again editable.
Barry.
One of the forum moderators.
Versions 6.5 to 27
i7-10700 @ 2.9Ghz, 32GB ram, GeForce RTX 2060 (6GB), Windows 10
Lenovo Thinkpad - i7-1270P 2.20 GHz, 32GB RAM, Nvidia T550, Windows 11