2006-09-1208:16 PM - last edited on 2023-05-2505:01 PM by Rubia Torres
2006-09-1208:16 PM
Is there a way to get out of the pre-fixed relationships ? IE: how can one make a 4" rise and 30" tread (other tham makeing the individual slabs and stacking them up).