I don't know the whole context of your issue, but the new vs existing reno status concerns me. If the whole project is new work and left as existing, why wouldn't that work.
I have projects where "new" status is reserved for "optional" construction.
And existing projects that want to be evaluated for their baseline characteristics before intervening with new construction.
Does EcoDesigner not address these different states of space/time?
Think Like a Spec Writer
AC4.55 through 27 / USA AC27-6000 USA
Rhino 8 Mac
MacOS 14.6.1