cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
Showing results for 
Search instead for 
Did you mean: 

More flexible schedule layout

Aarseth Emil
Participant

I miss the fact that the form is even more flexible and a little less rigid.

Recently I wanted to move the sum of the numbers in a form to be at the top. (see attached image) This cannot be done.
Another thing I wanted was to move the sum a little to the left so that the numbers end up on top of each other, so it looks neat.

All of these things are something you can do in Excel, but it feels heavy to take it over to Excel, and then take it back to Archicad.
You also lose the advantage of the numbers being updated automatically if you make changes to the area zones.


a.png

 

b.png

Status
Open

with 0/200 Votes 0%

Wish details