Slab area calculation..

Llian
Enthusiast
I am not sure what I am missing here...

The entire parkade slab is 65, 835 sf.

On the Archicad drawing, I made some slab openings for heated spaces that are added to 7000 sq.ft

The remaining unheated space should just be 65, 835 - 7000 = 58, 5835 sft.

But the schedule doesn't add up to 65, 835 sf. Instead, it is 72, 835 sf.

Why is that so?
Lilian Seow

LEED AP | cSBA

Interior-Architecture and BIM Management

AC20 USA | 27- macOS 10.14.6| 4 GHz Intel Core i7| 32 GB RAM | Archicad-user since 1994!
2 REPLIES 2

Barry Kelly
Moderator
Llian wrote:
But the schedule doesn't add up to 65, 835 sf. Instead, it is 72, 835 sf.

Why is that so?

That is adding the 7000 sf slabs.

Are you sure you created holes in your main slab or have you just added extra slabs for the heated parts?

Barry.

One of the forum moderators.
Versions 6.5 to 25
Dell XPS- i7-6700 @ 3.4Ghz, 16GB ram, GeForce GTX 960 (2GB), Windows 10
Dell Precision 3510 - i7 6820HQ @ 2.70GHz, 16GB RAM, AMD FirePro W5130M, Windows 10

Llian
Enthusiast
Thank you Barry.

I changed to criteria setting to the "holes" and it now adds up.

Surely there is a lot more to discover...
Lilian Seow

LEED AP | cSBA

Interior-Architecture and BIM Management

AC20 USA | 27- macOS 10.14.6| 4 GHz Intel Core i7| 32 GB RAM | Archicad-user since 1994!

Start a new conversation!

Still looking?

Browse more topics

Back to forum

See latest solutions

Accepted solutions

Start a new discussion!