cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
Showing results for 
Search instead for 
Did you mean: 
Collaboration with other software
About model and data exchange with 3rd party solutions: Revit, Solibri, dRofus, Bluebeam, structural analysis solutions, and IFC, BCF and DXF/DWG-based exchange, etc.

AC14 Scheduling Walls - Story Bug

Anonymous
Not applicable
I am creating schedules of my BIM that are producing quantities, lengths and areas of all building components for the QS. When creating a schedule for Ground Floor walls, even though I specify 'Story = 0' as a criteria it is scheduling walls on every floor.

Is this a known bug or is there something wrong with my BIM? I did not set all the walls to show on all storeys, they were set to only show on home storey.

I can (have) shown the storey as a criteria and can only look at Ground Floor walls and ignore others but it worries me that such information can sneak in when you have created a model and schedule correctly and put a huge amount of time/effort into making sure you have an accurate and complete BIM.
1 REPLY 1
Anonymous
Not applicable
I've just realised that I am an idiot, why would I create a separate schedule for each floor when I can just subtotal each floor on one schedule? One weeks paternity leave and my brain's turned to rot.

It's still a bug though but thanks Graphisoft, for once your ineptitude has balanced nicely, rather than compounded, with my own and produced a satisfactory, time saving result.